background image

IM-459004

M o d e l s

5

M a i n t e n a n c e   a n d   U s e

3

The diagram (Figure 3) shows a cross section of

the finished installation for the cement-in sleeve.

Notice that the sleeve is completely imbedded in

cement and that a good bond is secured between

the new and old concrete.  When installing the

sleeve in a new job, position the sleeve and line it

up when the forms are being installed.  Pour the

concrete around the sleeve as the deck or floor is

poured.  No special type of concrete is required.

NOTE:  A wad of newspaper stuffed into the top of the

sleeve will keep the interior free of concrete while the floor is

being poured.

Installation of Lifter

When the sleeve has been installed as described

above and the concrete has had several days to

cure, the lifter may be installed.  The nylon bearing

socket supplied with the lifter must be installed in

the sleeve (Figure 4).  Grease the outside of the

socket lightly before it is inserted into the sleeve.

This will prevent corrosion which may cause the

socket to stick in the sleeve. Vaseline is an excel-

lent lubricant if no commercial grease is on hand.

NOTE:  The socket should be removed occasionally to

prevent corrosion.

With the socket in place, unpack the lifter and

insert the base of the mast into the socket and

sleeve (Figure 4).  To attach the end of the boom

in the yoke hinge at the top of the mast, remove

the wing nut and bolt from the yoke hinge and

insert the boom end.  Reinsert the bolt and

secure with the wing nut.  Attach the swivel bar

to the boom end and to keep the chains apart.

The lifter is now ready for use.

Maintenance

Put a drop of oil on the joints at the top of the mast, top and bottom of the pump, and

the swivel bar hook every other month.
While oiling the lifter, check all the cap nuts and bolts to be sure they are tight.
Put a drop of oil on the pump handle hinge when the Hoyer lifter is put into service

and oil again every other month.  This is very important, as the holes in the hinge

socket will wear when dry.

NOTE:  In high humidity or salt areas, wax exposed lifter parts periodically to help prevent corrosion.

NOTE:  KEEP LIFTER DRY AND CLEAN

Figure 3

Figure 4

Boom 45”

Maximum Height 86”

Yoke Hinge

Mast

Nylon Bearing

Socket

(Grease Lightly)

Cement-In

Sleeve

Swivel

Bar

Отзывы: