- 25 -
center.
2-206
overcurrent of A
phase current
When the inverter is shut
down, the inverter is
operated automatically
after
the
fault
is
eliminated
1.Check
whether
the
power grid wiring is short
circuited, check whether
there is a interference
source beside the inverter,
if not, please restart the
inverter .
2.Check
whether
the
voltage waveform of the
power grid is abnormal.
2-207
overcurrent of B
phase current
2-209
A phase current
sampling loss
When the inverter is shut
down, the inverter is
operated automatically
after
the
fault
is
eliminated
1.Check
whether
the
power grid connection is
normal.
2.If the fault exists all the
time, restart the inverter .
3.If the restart of the
inverter is invalid, please
contact the Hefei Jntech
gathering
customer
service center.
2-210
B phase current
sampling loss
2-212
Overlimit of A
phase current on
DC component
2-213
Overlimit of B
phase current on
DC component
2-300
Failure of leakage
current sensor
When the inverter is shut
down, the inverter is
operated automatically
after
the
fault
is
eliminated
1.Check whether the grid
connection is normal.
2.If the fault exists all the
time, restart the inverter .
3.if the restart of the inverter
is invalid, please contact the
Hefei Jntech gathering
customer service center .
2-301
Overcurrent
300mA fault of
leakage current
2-302
30mA mutation
failure of leakage
current
2-303
60mA mutation
failure of leakage
current
2-304
150mA mutation
failure of leakage
current
2-313
A phase current
hardware current
limiting
Current limiting
operation of inverters
If running in off grid state,
check whether overloaded.
2-314
B phase current
hardware current
limiting
3-100
Array 1 DC hard
overcurrent
The PV module operates
the current limit.
Check whether the current
configuration of the first
PV
array
meets
the