26
Rowing pull rod cord diagram
Figure 15
1.
Thread the rowing rod (#80) (2770mm) without the ball head end through and attach the pulley
(#19) in sequence as shown; attach the end to the front bottom frame (#2) with 1 hex head bolt
M10x25 (#65), 2 flat pads
Φ10
(#56) and 1 lock nut M10 (#75);
2.
Attach the rowing rod (#23) and rowing rod pull cord (#80) (2,770mm) ball head end together
using 2 snap rings (#76) and a chain (#77) (280mm).
Note: The tension of the draw cord can be adjusted by adjusting the locking hole position of the
pulley (#19) on the adjusting plate (#24), or by adjusting the length of the chain (#120) (490mm).
Installation steps
Содержание E6
Страница 1: ...1 JMQ E6 ...
Страница 6: ...6 108 40x100 elliptical flat pipe plug 2 ...
Страница 7: ...7 ...
Страница 8: ...8 ...
Страница 9: ...9 ...