主起 落 架 安 装 示意图
Schematic diagram of main landing gear installation
4
5
6
①将主起落架放入起落架槽内,
调整好位置,注意图
5
红色箭头
所指的位置,起落架立板要卡
到位。
②使用φ
3
的麻花钻头将起落架
4
个螺丝孔位对应的木头区域钻
出
4
个孔使用螺丝规格:
M4x25
十字自攻螺丝固定,如图
4
所示。
③起落架盖板安装如图
6
所示,
对应好位置,使用螺丝规格:
M2x8
内六角固定。起落架盖板
的红圈位置根据起落架收放的
过程干涉到部分可进行相应的
裁切。
①
Put the main landing gear into the landing gear slot, adjust the position,
pay attention to the position pointed by the red arrow in Figure 5, the
landing gear vertical plate must be stuck in place.
②
Use a φ3 twist drill bit to drill 4 holes in the wood area corresponding to
the 4 screw holes of the landing gear. Use screw specifications: M4x25
Phillips self-tapping screws to fix, as shown in Figure 4.
③
The landing gear cover is installed as shown in Figure 6. Correspond to
a good position and use the screw specification: M2x8 hexagon socket to
fix it. The position of the red circle of the landing gear cover can be cut
according to the interference of the landing gear retracting process.
7