1
2
SECTION 4 - MACHINE OPERATION
3121773
– JLG Lift –
4-3
NOTE:
At low temperatures start the motor and let it run for a
few minutes, so that the hydraulic oil circulates and
reaches at least 50°F (10°C) before operating the plat-
form.
Diesel Engine Shutdown Procedure
1.
Remove all load and allow engine to operate at
low speed for 3-5 minutes; this allows further
reduction of internal engine temperature.
2.
Turn off the gas/diesel engine by using the gas/
diesel engine button
on the
platform/remote control box.
3.
The shutdown procedure takes about 1 minute,
wait for complete shut-off (display off ).
4.
Push POWER/EMERGENCY STOP switches at the
platform and ground in, to the off position.
5.
Turn engine key to off.
Electric Engine Starting Procedure - AC Voltage Machine
ENSURE THE ELECTRICAL CIRCUIT BEING USED IS THE SAME VOLTAGE AND
FREQUENCY INDICATED ON THE ELECTRIC ENGINE PLATE. USE AN AC EXTEN-
SION CORD WITH SUFFICIENT AMPERAGE CAPACITY TO PROPERLY POWER
THE MACHINE.
1.
Before connecting the machine to the electrical
circuit, ensure the key on the gas/diesel engine is
in the OFF position.
To
order
go
to
Discount-Equipment.com