SECTION 6 – GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
31210162
– JLG Lift –
6-21
3.
The tightening of the lug nuts should be done in stages.
Following the recommended sequence, tighten lug nut
per wheel torque.
4.
Wheel lug nuts should be torqued after the first 50 hours
of operation and after each wheel removal. Check
torque every 3 month or 125 hours of operation.
6.8 LUBRICATION
NOTE:
Recommended lubricating intervals are based on
machine operation under normal conditions. For
machines used in multi-shift operations and/or exposed to
hostile environments or conditions, lubrication frequen-
cies must be increased accordingly.
Table 6-9. Wheel Torque Chart
Torque Sequence - Studs A
1
st
Stage
2
nd
Stage
3
rd
Stage
28-42 N.m
(20-30 ft.lbs)
91-112 N.m
(65-80 ft.lbs)
142-163 N.m
(105-120 ft.lbs)
Torque Sequence - Studs B
1
st
Stage
2
nd
Stage
3
rd
Stage
25-35 N.m
(18-25 ft.lbs)
70-84 N.m
(51-61 ft.lbs)
120-140 N.m
(88-103 ft.lbs)
Содержание Toucan 12E
Страница 2: ......
Страница 12: ...TABLE OF CONTENTS vi JLG Lift 31210162 NOTES...
Страница 22: ...SECTION 1 SAFETY PRECAUTIONS 1 10 JLG Lift 31210162 NOTES...
Страница 34: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 JLG Lift 31210162 NOTES...
Страница 50: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 16 JLG Lift 31210162 Figure 3 9 Decal Installation Sheet 2...
Страница 51: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 31210162 JLG Lift 3 17 Figure 3 10 Decal Installation Sheet 3...
Страница 54: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 20 JLG Lift 31210162 NOTES...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 4 JLG Lift 31210162 Figure 4 3 Grade and Side Slope...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 31210162 NOTES...
Страница 81: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 5 Figure 6 2 Range Diagram 8E XL...
Страница 93: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 17 Battery Troubleshooting...
Страница 135: ......