Section 5 - Attachments
5-33
31200749
Operation:
• Raise or lower boom to appropriate height and open grapple for loading material
from stockpile.
• Align telehandler with face of stockpile and drive slowly and smoothly into pile to
load bucket.
• Tilt bucket up far enough to retain load, close grapple and back away from pile.
• Travel in accordance with requirements set forth in Section 1 - General Safety
• Open grapple and tilt bucket down to dump load.
Equipment Damage Precautions
• Except for lifting or dumping a load, the boom must be fully retracted for all
bucket operations.
• Do not corner-load bucket. Distribute material evenly within the bucket. Bucket
capacity charts are for evenly distributed loads only.
• Do not use bucket as a lever to pry material. Excessive prying forces could
damage bucket or machine structure.
• Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick attach or machine structure.
• Do not use bucket for "back dragging." This could cause severe damage to quick
attach and retraction cables/chains.
Содержание Skytrak 10042
Страница 3: ...Revision Log a 31200749 Revision Log REVISION LOG March 30 2012 A Original Issue of Manual ...
Страница 24: ...Section 1 General Safety Practices 1 14 31200749 This Page Intentionally Left Blank ...
Страница 33: ...Section 2 Pre Operation and Inspection 2 9 31200749 This Page Intentionally Left Blank ...
Страница 70: ...Section 4 Operation 4 12 31200749 This Page Intentionally Left Blank ...
Страница 75: ...Section 5 Attachments 5 5 31200749 This Page Intentionally Left Blank ...
Страница 79: ...Section 5 Attachments 5 9 31200749 This Page Intentionally Left Blank ...
Страница 106: ...Section 5 Attachments 5 36 31200749 This Page Intentionally Left Blank ...
Страница 116: ...Section 7 Lubrication and Maintenance 7 8 31200749 10054 OH4242 50 EVERY ...
Страница 117: ...Section 7 Lubrication and Maintenance 7 9 31200749 250 Hour Lubrication Schedule 6036 6042 OA1820 EVERY 250 6042 ONLY ...
Страница 118: ...Section 7 Lubrication and Maintenance 7 10 31200749 8042 10042 10054 OH4172 EVERY 250 ...
Страница 119: ...Section 7 Lubrication and Maintenance 7 11 31200749 1000 Hour Lubrication Schedule OH4181 1000 EVERY ...
Страница 148: ...Index 4 31200749 ...
Страница 150: ...Inspection Maintenance and Repair Log Date Comments ...
Страница 152: ......