3.12 PARKING AND STOWING MACHINE
1.
Drive the machine to a well-protected and well-venti-
lated area.
2.
Ensure the platform is fully lowered.
NOTICE
WHEN THE MACHINE IS SHUT DOWN FOR OVERNIGHT PARKING OR BATTERY
CHARGING, THE EMERGENCY STOP AND POWER SELECT SWITCHES MUST BE
POSITIONED TO OFF TO PREVENT DRAINING THE BATTERIES.
3.
At the ground control station, turn the platform -
ground selector key switch to OFF and remove the key
to disable the machine and prevent unauthorized use.
NOTE:
For added protection, the platform control station can be
secured to it’s mounting plate see Figure 3-14.
4.
At the ground control station, depress emergency
stop switch to the off position.
5.
If necessary, cover the platform control box, instruc-
tion placards, caution and warning decals so that they
will be protected from hostile environment.
6.
Chock at least two wheels when parking the machine
for an extended period of time.
To prevent unauthorized removal, the platform control sta-
tion can be secured to it’s mount by replacing the lock pin
located on it’s mounting tab with a keyed or combination
lock.
Figure 3-14. Securing Control Station to Platform