background image

Page 5 • JL Audio, Inc., 2016

Continued on Next Page 

S T E P 16

Thread a 1/4 - 20 x 1” Serrated Flange Head 

Bolt through each of the three holes in the 

U-Bracket, into the threaded inserts in the 

bottom of the enclosure as shown, and hand 

tighten.

S T E P 15

Slide the upper hole in the Side Bracket over 

the M8 - 1.25 x 30 mm Button Head Cap 

Screw installed in 

Step 9

.  Thread an M8 - 1.25 

Serranted Flange Locknut over the M8 - 1.25 

x 30 mm Button Head Socket Cap Screw, and 

hand tighten.

S T E P 14

Slide the Stealthbox® into position between 

the upper and lower frame rails.

S T E P 13

Thread a pair of 1/4 - 20 x 1” Serrated Flange 

Head Bolts through the holes in the side of 

the Side Bracket, into the threaded inserts in 

the side of the enclosure as shown, and hand 

tighten. 

S T E P 12

Remove the outer bolt and nut from the rear 

frame rail.  These will be reinstalled in 

Step 17

.

S T E P 11

Remove the outer bolt and nut from the front 

frame rail.  These will be reinstalled in 

Step 17

.

S T E P 10

Locate the two indicated outer bolts on the 

frame rails.

S T E P 9

Install the M8 - 1.25 x 30 mm Button Head Cap 

Screw in place of the bolt removed in the

previous step, and fully tighten.

SB-H-PIO7/10TW3  INSTR_SKU# 011461

Отзывы: