background image

2

Inspect frequently

Installer — Instruct the building owner to frequently inspect the CBM neutrazlier and all condensate connections. The owner must 

notify a qualified technician if any problems are noticed.

Replacement parts

Contact JJM® Boiler Works, your local wholesaler or manufacturer’s representative for replacement parts and refill kit.

!

DANGER

Install all electrical wiring in accordance with the National 
Electrical Code and local requirements.

Indicates a condition or hazard which will cause severe 

personal injury, death or major property damage.

WARNING

Indicates a condition or hazard which may cause severe 

personal injury, death or major property damage.

CAUTION

Indicates a condition or hazard which will or can cause 

minor personal injury or property damage.

NOTICE

Indicates special attention is needed, but not directly related 

to potential injury or property damage.

NOTICE

This unit when installed must be electrically grounded in 

accordance with the requirements of the authority having 

jurisdiction or , in the absence of such requirements, with 

the current edition of the National Electrical Code, ANSI/

NFPA 70 and/or the Canadian Electrical Code, Part 1, CSA 

C22.1, Electrical Code.

CAUTION

Label all wires prior to disconnection when servicing con-

trols. Wiring errors can cause improper and dangerous 

operation. Verify proper operation after servicing.

CBM-226

 Acidic Condensate pH Treatment Kits –– Installation/Operation & Maintenance

Overview

!

!

!

!

!

Содержание CBM-226

Страница 1: ...estfield MA 01085 413 527 1893 690 Island Way Unit 206 Clearwater FL 33767 413 427 3373 jjmboilerworks net Revised March 2019 CBM 226 Installation Operation Maintenance Model CBM 226 Acidic Condensate pH Treatment Tube ...

Страница 2: ...usedbythefollowing A Improper Combustion B Contaminated Combustion Air C High Sulfur Content in Gas Supply D pH below 2 0 is considered hazardous waste by EPA Contact JJM Technical Service at 413 427 3373 or 413 527 1893 JJM highly recommends operating your heating equipment for 24 48 hours prior to connecting a neutralizer so as to flush out dirt grease and oils from connected piping and the heat...

Страница 3: ...onal injury death or major property damage CAUTION Indicates a condition or hazard which will or can cause minor personal injury or property damage NOTICE Indicatesspecialattentionisneeded butnotdirectlyrelated to potential injury or property damage NOTICE This unit when installed must be electrically grounded in accordance with the requirements of the authority having jurisdiction or in the absen...

Страница 4: ...ndensate pH needs to be increased made more neutral to prevent possible damage to cast iron soil pipe ABS pipe septic tanks plants wastewater treatment plants and other materials handling waste water CBM condensate pH treatment tubes increase pH reduce acidity CBM fire side condensate neutralizing tubes are designed to raise the pH level of the condensate discharged by high efficiency boilers warm...

Страница 5: ...e unions in the piping to allow removal of the CBM tube for inspection and service Secure pipe or tubing in place Protect with a shield if necessary if routed through traffic areas R Use hose clamps at all connections when using plastic tubing S Condensate drain termination at floor drain or condensate pump reservoir inlet secure in place with clamps Follow instruc tions for condensate pump T Elev...

Страница 6: ...vice technician immediately if flow through the overflow line is frequent or steady Make sure the installation complies with all local code requirements Piping for multiple boilers furnaces vent see figures 6 7 8 9 and 10 A Boilers Hot Water Heaters Furnace Condensate Drains B By pass Drain C By pass Piping D pH Treatment Tube E House Drain F Boiler Hot Water Heater Furnace Condensate Drain Note C...

Страница 7: ...rs Individual pH Treatment Kits Common Piping C D E F Boilers Hot Water Heater Condensate Common Drain Common Flue Vent Neutralizer Tube or Tank House Drain Boilers Hot Water Heaters Furnaces Note Contact Factory for Neutralizer Sizing and Piping Sizing F F F F D D D D A E D Figure 7 Piping for Single Heating Unit with Common pH Treatment Tube or Tank A Boilers Hot Water Heaters Furnace Condensate...

Страница 8: ... outlet falls below 5PH Local codes may have different requirement check with local authority Replacement parts Contact your local wholesaler or manu facturer s representative for replacement parts Dealerlistingatwww jjmboilerworks com OUTDOOR INSTALLATIONS provide and install electric heat tape and insulation on the condensate drain lines and around the tube to prevent possibility of neutralizer ...

Страница 9: ... water to flush out the tank If your neutralizer pellets are incased in a porous pellet bag there are three methods to agitating the pellets 1 Remove the pellet bag or bags from the tank and using your hands move the pellets around inside the bags 2 Using a five gallon bucket filled with fresh tap water use step one with the bag under water 3 Using a fresh water hose slowly pour fresh water over b...

Отзывы: