- 9
-
﹡
Note:
1) All installation methods herein are only for reference, and Jinko solar will not
provide related mounting components, the system installer or trained professional
personnel must be responsible for the PV system‟s design,
installation, and
mechanical load calculation and security of the system.
2) Before installing, you should confirm below important things:
1) Visual check before installation, to make sure there is no bug in the packing
and junction box as well as the surface of module, If have , remove and clean
it .
2) Check the series number is right or not.
3)
The modules installed at screws and the normal PV modules installed at the long
sides with clamps are designed to meet a maximum positive (or downward)
pressure of 5400Pa and negative (or upward) pressure of 2400 Pa (Refer to the
mentioned module type in Table 1 and 2 in this manual). The light PV module and
the modules installed at the short sides with clamps are designed to meet a
maximum positive (or downward) pressure of 2400Pa and negative (or upward)
pressure of 2400 Pa (Refer to the mentioned module type in Table 3 and 4 in this
manual). When mounting modules in snow-prone or high-wind environments,
Special care should be taken to mount the modules in a manner that provides
sufficient design strength while meeting local code requirements.
2.3.1 Fixation with screws
The applicable products please refer to table 1.
The frame of each module has 8 mounting holes (Length* Width: 14mm*9mm) used
to secure the modules to support structure. Always use all the eight mounting holes to
secure the modules. The module frame must be attached to a mounting rail using M8
corrosion-proof screws together with spring washers and flat washers in eight
symmetrical locations on the PV module. The applied torque should be big enough to
fix it steadily. Please find detailed mounting information in the below illustration,