晋能清洁能源科技股份公司
13
2018/12/25
Bolt
in
g
Grounding holes
Mounting slot
Label
1.The specific way of installation is on the base of EPC
2.The four mounting slots are matched with M8 bolts
3.Put two washer into the bolt on both side of the frame
Installation
Installation method