![Jimmy at work SPR10012 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/jimmy-at-work/spr10012/spr10012_instruction-manual_647574023.webp)
3517mm
2742mm
300mm
300mm
800mm
Installation instructions and illustrations
1
.Make sure the ground flat and firm
before installing, avoid the ground
subsidence and cause the
greenhouse to tilt.
2.
If you need to permanently
install without moving, please use solid
bricks and concrete to make the
building foundation, make the house
stronger.
3.
Additional ground anchors or
expansion screws required for different
floors are required to be purchased
by the user, and this product is not
provided.
Use of Wells(Pouring
concrete after inserting
ground anchor)
After the construction of the
Civil Foundation,
it needs to be dry for 3-5
days. Then the
greenhouse components can
be placed on
the Civil Foundation.
Содержание SPR10012
Страница 8: ...D4L D10 F4X8 X2 X2 D4RX2 1 D10 D4R 2 D10 D4R 3 F4 D4R D10 D4L 4 D4L D4R 20 6 F4 D4R D4L X2pcs a b F4...
Страница 9: ...2 G3 F2X16 X8 20 7 1 F2 F2 F2 G3 3 1 2 3 1 2 3 a b a b x1 x1 G3 G3 G3 G3 X2pcs...
Страница 10: ...25mm 2 3 4 D9 D9 D9 F2 1 D9 D9X2 F2X20 F2 20 8 1 1 5 D9 25mm D9 D9 5 5 4 3 3 3 2 4 3 2 F2...
Страница 11: ...F5 D1 D2 X16 X2 X2 G5 X4 G5 F5 F5 1 2 G5 20 9 1 2 D1X2pcs D2X2pcs...
Страница 16: ...P1 P1 P1 P1 P1 P1 P1 P1 P1 X7 P1 1 2 20 14...
Страница 18: ...2 A1 X2 A2 X4 A3 X4 A4 1 2 3 NO NO NO 20 16 4 X X 4 X 4 A4 A3 A1 A1 A1...
Страница 19: ...x2 D5 x2 D6 x4 C1 D5 D6 Eaves 1 2 3 D6 D6 D6 D5 C1 C1 x2 A5 A5 A5 20 17 x2 6 A5...
Страница 21: ...2 A1 F7x8 x2 G8 x2 x2 1 F1 G4 G5 F7 F7 x2 G9 G8 G9 5 3 20 19 F1 F1x4 4 1 1 1 1 2 3 2 3 4 4 5 5...
Страница 22: ...1 2 F8 16 20 20 F8 F8 F8...