
Many of the solvents commonly used to clean machinery can be toxic when inhaled or ingested.
Always work in well ventilated areas far from potential ignition sources when dealing with
solvents. Use care when disposing of waste rags and towels to be sure they do not create fire
or environmental hazards.
ASSEMBLY
Moving & Placing Saw Base Unit
The Sliding Panel Saw is a heavy machine. Serious personal injury may occur if safe moving
methods are not followed. To be safe, you will need assistance and power equipment when
moving the shipping crate and removing the machine from the crate.
Use lifting straps with a minimum of 500 kgs lifting capacity. If the lifting strap breaks, serious
personal injury may occur.
1. Remove the top of crate and position the forklift forks together and directly above the saw.
2. Place four lift rings onto Saw Base Unit and place two lifting straps over the forks and attach the lifting
rings
.
3. Insert a wood block for protecting the main switch.
4. Lift the saw base unit and move it to your predetermined location.
5. Before lowering the saw into position, place four rubber blocks under the frame.
6. Lower the saw on the floor.
Install the extension table
Take out the extension table, steel plate extension t able and rear extension table from the Saw
Base Unite crate.
1.
Attach the extension table to major table with 4-M8x20 hex head screws/ washers.
2
.
Center the extension table over the edges and tap it. Check the surface alignment.