1.

Install

 

first

 

length

 

of

 

flue

 

pipe

 

crimped

 

end

 

down,

 

inside

 

gather

 

collar.

 

Rivet

 

flue

 

pipe

 

in

 

3

 

places

 

around

 

gather

 

collar.

 

Place

 

bottom

 

flue

 

spider

 

bracket

 

around

 

gather

 

flue

 

pipe

 

collar,

 

secure

 

in

 

position

 

by

 

tightening

 

up

 

coach

 

bolt/screw

 

(supplied).

 Seal flue with fire 

2.

Install

 

second

 

length

 

of

 

the

 

flue

 

pipe

 

crimped

 

end

 

down

 

and

 

fix

 

by

 

riveting

 

in

 

at

 

least

 

3

 

places

 

around

 

the

 

flue

 

pipe

 

joint.

3.

Install

 

first

 

length

 

of

 

the

 

flue

 

pipe

 

casing

 

by

 

positioning

 

on

 

installed

 

bottom

 

flue

 

spider

 

bracket

 

crimped

 

end

 

up.

4.

Position

 

flue

 

spacer

 

at

 

the

 

flue

 

pipe

 

joint.

5.

Repeat

 

steps

 

1

 

-

 

4

 

to

 

the

 

required

 

flue

 

height.

 

As

 

per

 

AS/NZS2918:2001

 

4.9.1

a.

“the flue

 

pipe

 

shall

 

extend

 

not

 

less

 

than

 

4.6m

 

above

 

the

 

top

 

floor

 

protector”.

b.

“the

 

minimum

 

height

 

of

 

the

 

flue

 

system

 

within

 

3m

 

distance

 

from

 

the

 

highest

 

point

 

of

 

the

 

roof

 

shall

 

be 600mm above

 

that point”.

c.

“the

 

minimum

 

height

 

of

 

a

 

flue

 

system

 

further

 

than

 

3m

 

from

 

the

 

highest

 

point

 

of

 

the

 

roof

 

shall

 

be”

 

a

 

minimum “1000mm above

 

roof

 

penetration”.

d.

“no

 

part

 

of

 

any

 

building

 

lies

 

in

 

or

 

above

 

a

 

circular

 

area

 

described

 

by a

 

horizontal

 

radius

 

of

 

3m

 

about

 

the

 

flue system

 

exit”.

6.

The

 

last

 

length

 

of

 

flue

 

pipe

 

needs

 

to

 

extend

 

past

 

the

 

flue

 

pipe

 

casing

 

by

 

at

 

least

 

150mm

 

or

 

flush

 

with

 

the

 

top

 

of

 

the

 

casing

 

cover

 

spigot

 

when

 

fitted

 

-

 

sizing/measuring

 

and

 

cutting

 

down

 

should

 

be

 

carried

 

out

 

prior

 

to

 

the

 

flue

 

pipe

 

casing

 

being

 

fitted

 

over

 

the

 

flue

 

pipe.

7.

Before

 

fitting

 

casing

 

cover,

 

place

 

the

 

spider

 

in

 

opposition

 

with

 

the

 

spider

 

post

 

facing

 

down

 

between

 

the

 

flue

 

pipe

 

and

 

flue

 

pipe

 

casing.

 

Secure

 

spider

 

in

 

position.

 

Place

 

the

 

casing

 

cover

 

over

 

the

 

flue

 

pipe,

 

press

 

down

 

firmly

 

onto

 

the

 

spider.

 

Check

 

airway

 

around

 

the

 

casing

 

cover

 

is

 

clear,

 

then

 

secure

 

in

 

position

 

using

 

three

 

stainless

 

steel

 

rivets.

8.

Fit

 

cowl

 

to

 

top

 

of

 

flue

 

-

 

DO

 

NOT

 

RIVET

 

IN

 

POSITION.

 

In

 

high

 

wind

 

areas,

 

it

 

is

 

recommended

 

that

 

the

 

cowl

 

be

 

secured

 

in

 

position

 

with

 

a

 

stainless

 

steel

 

self

 

tapping

 

screw,

 

this

 

will

 

enable

 

the

 

cowl

 

to

 

be

 

removed

 

for

 

cleaning.

 

Discuss

 

Bird

 

Proofing

 

needs

 

with

 

your

 

installer.

9.

If

 

flue

 

is

 

concealed

 

in

 

a

 

chase,

 

allow

 

for

 

air

 

vents

 

(2

 

x

 

80mm

 

diam.

 

or

 

equivalent)

 

at

 

the

 

highest

 

possible

 

point

 

on

 

the

 

chimney

 

chase

 

or

 

alternatively,

 

allow

 

a

 

min

 

25mm

 

air

 

space

 

between

 

the

 

casing

 

cover

 

spigot

 

and

 

the

 

outer

 

casing.

 

Refer

 

to

 

pg.

 

12.

FLUE INSTALLATION – SOLID FUEL

3000

or less

3000

More than 3000

600 min.

3000

increase from 1000mm 

minimum until clear within 

3000mm of flue top

increase as necessary 

until nothing within 

3000mm of flue top

Any nearby structure

As per AS/NZS 2918:2001 4.9.1 Fig 4.9

MINIMUM HEIGHT OF FLUE SYSTEM EXIT

Note: 2 x flue lengths are supplied as a minimum for free standing outdoor built installations. If

the outdoor fire structure is attached to the house the flue will need to be extended and meet

the following requirements

;

11

Содержание QUADRO 1050

Страница 1: ...id the warranty Due to continued product improvement The Fireplace Ltd reserves the right to change product specifications without prior notification Please check to ensure you have the latest installation instructions TYPICAL JETMASTER IN BUILT TIMBER FRAME MASONRY FIREBOX INSTALLATION INSTRUCTIONS FOR QUADRO OUTDOOR WOOD FIRE BBQ GRILL 08 2022 1 ...

Страница 2: ...Front Face Margin Firebox Installation Masonry Cavity Plan Section Firebox Installation and Margins Flue Installation Flue Penetration Chimney Chase Air Ventilation Floor Protector requirements Hebel Cut Out Schedule 3 4 4 5 6 7 8 9 10 11 12 13 14 2 Head Office Showroom 12 Tawari St Mt Eden Auckland Ph 09 623 6990 thefireplace co nz ...

Страница 3: ... OR AEROSOLS TO START OR REKINDLE THE FIRE OR IN THE VICINITY OF THIS APPLIANCE WHEN OPERATING DO NOT STORE FUEL WITHIN HEATER INSTALLATION CLEARANCES WHEN OPERATING THIS APPLIANCE AS AN OPEN FIRE USE A FIRE SCREEN THIS APPLIANCE SHOULD BE MAINTAINED AND OPERATED AT ALL TIMES IN ACCORDANCE WITH THESE INSTRUCTIONS USE OF SOME TYPES OF PRESERVATIVE TREATED WOOD AS A FUEL CAN BE HAZARDOUS IF INSTALLE...

Страница 4: ...is raised it must be placed on top of a 75mm Hebel panel which is placed on top of a steel structure or masonry blocks A TIMBER BASE IS NOT ACCEPTABLE Please note that these dimensions based on Hebel Block margins are the absolute minimum sizes widths A B maybe increased if desired Table 2 TIMBER FRAME DIMENSIONS JETMASTER FIREBOX DIMENSIONS 4 Table 1 Note All dimensions are in mm ...

Страница 5: ...be bird rodent proofed with permanently fixed screen Rebate to suit tiles or other non combustible material on Floor Protector It is important to ensure the Jetmaster firebox is seated at the required finished Floor Protector level see Table 5 min 25mm from flue pipe casing to combustible material 25 25 Drawing Not To Scale Drawing Not To Scale Optional Finishing Stone Brick Plaster on Brick min 2...

Страница 6: ...6 ...

Страница 7: ...al wall lining eg Promatect H to cover the extent of the Hebel panel surround shown shaded Directly touching the firebox with any board or plaster finish will cause cracking from heat expansion Allow 2mm minimum space away from the firebox J e t ma s t er Margin Lintel min 300mm Timber Framing 75mm min Hebel Block or 100mm Concrete Note Ensure allowance made for firebox to sit on top of finished F...

Страница 8: ...sure a strip of glass rock wool insulation is between the inner hebel leg face and the firebox Nail through stud into hebel leg to secure in place Locate and position firebox fit and seal gather in cavity Earthquake restraints may be positioned by drilling through firebox into the floor protector in a position midway beneath the log pan Two 12mm dynabolts or similar will suffice Do not over tighte...

Страница 9: ... Vent Refer to Table 5 for Floor Protector dimension Air Vent min 2 x 100 x 50mm or 80mm diam wall of floor mounted air vents Drawings Not To Scale 9 Note If the appliance is exposed not under protective cover please recess the appliance Min 40mm Max recess 100mm Add recess dimension to B dimension in Table 3 100 700mm recess Allow 5mm gap around all four sides of the firebox to fit Stainless Stee...

Страница 10: ...d on Masonry margins are the absolute minimum sizes widths A B maybe increased if desired If you intend on recessing the firebox please add the recess value to Dimension B WARNING Minimum cavity sizes leave NO MARGIN FOR ERROR If the cavity is larger than minimum dimensions A B close up the lateral sides using Hebel block concrete block or similar do not use any combustible material Refer to Table...

Страница 11: ... cutting down should be carried out prior to the flue pipe casing being fitted over the flue pipe 7 Before fitting casing cover place the spider in opposition with the spider post facing down between the flue pipe and flue pipe casing Secure spider in position Place the casing cover over the flue pipe press down firmly onto the spider Check airway around the casing cover is clear then secure in po...

Страница 12: ... min 2 x 80mm dia or equal square or rectangle shaped area min 25mm gap between flue pipe casing combustible surface EXTERNAL REQUIREMENTS SOLID FUEL Refer to AS NZS2918 2001 4 9 1 Note All external air vents ceiling penetrations must be bird rodent proofed with permanently fixed screens Drawing Not To Scale Minimum 25mm gap between flue pipe casing combustible surface Air Vent min 2 x 80mm diam o...

Страница 13: ...ce from flue pipe casing to combustible material must be maintained A Minimum clearance of 200mm above Heat Shield must be maintained CHIMNEY CHASE MINIMUM TRIM OUT MODEL A B C Floor Level 1400 800 75 Raised 500mm 1400 1000 75 A B C A minimum 75mm thickness refers only to Hebel Block for solid fuel installations Minimum 100mm thickness required if poured concrete Table 5 MINIMUM FLOOR PROTECTOR SI...

Страница 14: ...14 ...

Отзывы: