background image

Module Type                        Cell Type         Cell           Dimensions           Mounting Hole    Mounting Hole

   

                                

Quantity  

    

A x B x C (mm) 

       

 E

 

(mm)           G x F (mm) 

  Attach a separate conductor as grounding wire to the 4mm

  diameter grounding holes with a set of M4 bolt, cup
  washer, flat washer, lock-toothed washer, spring washer and
  nut.

  Exposed copper of the grounding wire shall not contacts the

  module frame in case of corroding the frame.

5) Wiring

For the wiring, pay attention to:

• 

To minimize the risk of indirect lighting strike, avoid forming  

 

  closed loops when designing the system. Check that wiring    
  is correct before starting the generator. If the measured open
  circuit voltage (Uoc)[and short-circuit current[(Isc) different
  from the specifications, there may be a wiring fault.            

• 

Jetion modules use the J-Box, on the backside of the module,

   is weatherproof and is designed to be used with standard
  wiring or conduit connections. Wiring methods should be in
  accordance to the NEC (National Electrical Code). Bypass 
  diodes and cable clamps are included with each module when  
  shipped from the factory.

• 

Use modules of the same configurations in the same system.

  When connected in series, all modules must have the same
  current. When connected in parallel, the modules must all have
  the same voltage. The quantity of modules connected should
  match the voltage specifications of the devices used in the
  system. The modules must not be connected together to
  create a voltage which is higher than the permitted system 
  voltage. When designing the Jetion system, please always
  take into consideration the variation of the voltage under
  different temperatures (please check the respective tempera- 
  ture coefficients of the modules, the Voc of the modules will be
  rise when the temperature drops).

• 

The number of modules in series and in parallel in a system.

• 

While connecting the modules in series, the total voltage

  should be less than the maximum system voltage Umax[(IEC:[  
  Umax=1000V;[UL:[Umax=600V).

• 

While connecting the modules in parallel, the total current 

  should be less than the maximum system current.  

6) Maintenance and Cleaning

• 

Do not change the PV components optionally (diode, junction   

  box, plug connectors).

• 

Given a sufficient tilt (at least 15°C), it is not generally neces-

  sary to clean the modules (rainfall will have a self-cleaning 
  effect). In case of heavy soiling (which will result in output
  reductions), we recommend cleaning the modules using
  plenty of water (from a hose) with mild detergent and using 
  a gentle cleaning implement (a sponge). 

CAUTION[DON’T 

  USE DETERGENTS CONSISTING OF ABRASIVE, ACETONE
  OR OTHER CORROSIVE ELEMENTS.

 Do not clean the 

  modules with cold water during the warmer hours of the day
  in order to avoid creating any thermal shock that maybe 
  damage the module.                                                                          

  Dirt must never be scraped or rubbed away when
  dry, as this will cause micro-scratches. We recommend that    
  the system is being inspected at regular intervals.  

                                                                         

7) Checklists

  All fastenings are tight and secure and free of corrosion.

  All cable connections are secure, tight, clean and free of 

  corrosion.

  Cables are not damaged in any way.

  Checking the earthing resistively of metals.

8) Warning

  The maximum load on the module must not exceed 30 lb/ft²

  (146.5 kg/m²). To avoid exceeding the maximum load, site-
  specific live loads such as wind and snow should take into  

 

  account.

  We recommend that the maximum number of modules in

  parallel should be no more than 2. When more than two 
  modules or strings are planned to be put in parallel, use string
  fuses. The number of modules in series has to be made 
  according to the max system voltage of the inverter which is
  being used. However the Voc Voltage of all modules in series
  should never exceed more than 1000V. 

  The plug connector has its own polarity. Make sure that the

  connection is safe and tight. Ensure that they are in good 
  electrical and mechanical condition.

  The plug connector should not receive external stress.

  Do not attempt to drill holes in the glass surface of the 

  modules.

  Do not drill additional mounting holes in the frame of the 

  modules.

  Do not hoist the module through the J-Box or cable. 

  Never use a module with broken glass or torn substrate. 

  Broken modules cannot be repaired and contact with any  

 

  module surface or frame can lead to electrical shock.

  Do not install or handle modules when they are wet or during    

  the period of high wind.

  Keep children well away from the system while transporting    

  and installing mechanical and electrical components. 

  Do not strike or physically damage the module. 

  Avoid cutting and damaging the frame and the frontside or  

  backside surface of the module during handling and installati-   
  on.

  Do not stand or step on the module.

  Do not put extra objects on the module in case of glass 

  broken.

  The J-Box must be on the higher side of the module when it is  

  mounted.

Содержание JTxxxSFb series

Страница 1: ...Installation Manual Visionary green energy...

Страница 2: ...enance Jetion reserves the right to update the product specifications or this Installation Manual without prior notice 1 Certificates requests 1 1 IEC 61730 Jetion modules are designed to fulfill the...

Страница 3: ...other modules When a bypass diode is wired in parallel with the series string the forced current will flow through the diode and bypass the shaded module thereby minimizing module heating and array c...

Страница 4: ...system The modules are Class C You can mount them over a Class C B or A roof The amount of area the modules cover may degrade the roof s original fire rating in some loca tions Do not install modules...

Страница 5: ...2 12 12 12 0 5 2 0 5 2 0 5 2 0 5 2 0 5 2 0 5 2 0 5 2 0 5 2 2 5 3 2 5 3 2 5 3 2 5 3 2 5 3 2 5 3 2 5 3 2 5 3 M8 Screw Middle Modules Installation Frame long side Mounting rail Clamp The movement of the...

Страница 6: ...2 725x942 1176x942 JT SFa b JT SAa b JT SAa b Black JT SBa b JT PFe JT SFc JT PEe JT SEc JT PDe JT SDc JT SDc Black JT PCe JT SCc JT SCc Black JT PAe JT SAc Mono Mono Mono Poly Mono Poly Mono Poly Mon...

Страница 7: ...ons we recommend cleaning the modules using plenty of water from a hose with mild detergent and using a gentle cleaning implement a sponge CAUTION DON T USE DETERGENTS CONSISTING OF ABRASIVE ACETONE O...

Страница 8: ...ically conducting parts into the plugs or sockets Do not fit solar modules and wiring with wet plugs and sockets Exercise utmost caution when carrying out work on wiring and safety equipment use insul...

Страница 9: ...ww jetion biz JETION SOLAR CHINA Jetion Solar China Co Ltd No 1011 Zhencheng Road Shengang Jiangyin Municipality Jiangsu Province 214443 Peoples Republic of China Phone 86 510 8668 7300 Fax 86 510 866...

Отзывы: