8
Read and understand all
assembly and setup instructions before
attempting assembly. Failure to comply may
cause serious injury.
5.0
Setup and assembly
5.1
Shipping contents
See Figure 5-1
1
Mill-Drill (not shown)
2 Drill
arbor
(pre-installed)
1
Draw bar R8-7/16 in.
(pre-installed)
3
Handwheels – A
1
Face mill cutter assembly 3in. (74mm) – B
1
Face mill cutter arbor – C
4
Small handles – D
1
Crank handle – E
3
Downfeed handles – F
(non-powerfeed models
only)
1
Drill chuck with key 13mm/JT6 – G
1
Socket wrench – H
1
Box wrench 17/19mm – H1
3
Hex wrenches, 3/4/5mm – J
1
Hardware package (see
sect. 12.1.2
):
2
Bolts – K
2
Flat washers – L
2
Hex nuts – M
1
Socket hd cap screw 3/8x1 – N
1
Flat washer 3/8 – O
1
Angle vise 3-inch – P
1
Operating instructions and parts list
1 Product
registration
card
Figure 5-1: contents (not to scale)
5.2
Tools required for assembly
Cross-point (Phillips) screwdriver
14mm open-end (or adjustable) wrench
3mm and 5mm hex wrenches (provided)
5.3
Unpacking and cleanup
1. Inspect contents for shipping damage. Report
damage, if any, to your distributor. Do not
discard shipping materials until Mill-Drill is
installed and running properly.
2. Compare contents of shipping carton with the
contents list in this manual. Report shortages, if
any, to your distributor. Note: Check machine
first in case some parts are pre-installed.
3. Remove rust protectant from exposed surfaces
with a clean rag and cleaner/degreaser or
kerosene. Avoid getting solvents on rubber or
plastic parts.
4. Apply a light coat of oil to exposed metal
surfaces to inhibit rust.
5.4
Location
Machine is heavy; use
appropriate lifting device and exercise caution
when moving to final location. Failure to comply
may cause serious injury.
1. The location for the mill-drill should be dry, with
good overhead lighting and room enough for
head to rotate 360° around column, for
maximum table travel, loading and offloading of
stock, and general maintenance.
2. Before bolting mill-drill to a bench or stand, the
unit must be level: Place a level on table in both
directions. If table is not level, shim under the
low corner(s) until level. Tighten fastening bolts.
(See Figure 4-1 for mounting hole spacing.)
3. Check for level again. Adjust as necessary until
mill-drill is level after fastening hardware has
been tightened.
NOTE: An optional stand is available from JET, see
sect. 11.0
.
5.5
Assembly
See Figure 5-1 to identify parts.
1. Screw three downfeed handles (F) into hub and
tighten. Flat spot on rod accommodates an
open or adjustable wrench.
Note:
Handle shafts
are already installed into hub on powerfeed
models.
2. Slide crank (E) onto shaft of column (see Figure
7-2) and tighten set screw. Make sure set screw
seats on flat part of shaft.
3. Thread handle (D) into crank and tighten nut.
Содержание JMD-40GHPF
Страница 17: ...17 12 1 1 JMD 40GH 40GHPF Table Base and Column Assembly Exploded View...
Страница 20: ...20 12 2 1 JMD 40GH 45GH non powerfeed Gear Head Assembly Exploded View...
Страница 24: ...24 12 3 1 JMD 40GH 45GH non powerfeed Gears Assembly Exploded View...
Страница 26: ...26 12 4 1 JMD 40GHPF 45GHPF powerfeed Gear Head Assembly Exploded View...
Страница 30: ...30 12 5 1 JMD 40GHPF 45GHPF powerfeed Gears Assembly Exploded View...
Страница 32: ...32 12 6 1 JMD 45GH 45GHPF Table and Base Assembly Exploded View...
Страница 35: ...35 12 7 1 JMD 45GH 45GHPF Square Column Assembly Exploded View...
Страница 37: ...37 13 0 Electrical Connections JMD 40GH 45GH series 13 1 Wiring Diagram 115V...
Страница 38: ...38 13 2 Wiring Diagram 230V...
Страница 40: ...40 427 New Sanford Road LaVergne Tennessee 37086 Phone 800 274 6848 www jettools com...