9
ECB-1422V
7.0 INSTALLATION
For best performance, the band saw should be located
on a solid and level concrete foundation. Allow room for
servicing and for moving large stock around the band saw
when deciding upon a location for the machine.
1. Lift machine with forklift, using lifting straps that are
isolated from the band saw’s fi nished surfaces, levers,
knobs, etc.
2. Install the four leveling bolts with lock nuts on both
sides of the base as shown in Fig 7-1. Lower machine
to the fl oor.
3. Place a level on the work table surface and check
side-to-side and front-to-back. When leveling side-to-
side, adjust left side to be approximately 5mm higher
than the right side. When leveling front-to-back, adjust
back to be approximately 5mm higher than the front.
4. Adjust leveling screws as needed, then tighten nuts.
Fig. 7-1
Check with a qualifi ed electrician or service
personnel if the grounding instructions are not
completely understood, or if in doubt as to whether
the tool is properly grounded. Failure to comply may
cause serious or fatal injury.
Electrical connections must be made by a qualifi ed
electrican in compliance with all relevant codes. This
machine must be properly grounded to help prevent
electrical shock and possible fatal injury.
9.0 ELECTRICAL CONNECTIONS
9.1 GROUNDING INSTRUCTIONS
The ECB-1422V is prewired for 230V, 3 phase, and can
be converted to 460V 3 phase. Confi rm that power avail-
able at the saw’s location matches that for which the saw
is wired.
The machine is not provided with an electrical plug; it can
be “hardwired” directly to a service panel.
It is recommended that the band saw be connected to a
dedicated 20 amp circuit with circuit breaker or time-delay
fuse marked “D”.
Local codes take precedence over
recommendations.
Before connecting to power source, be sure switch is in off
position.
Permanently connected tools: This tool should be con-
nected to a grounded metal permanent wiring system; or
to a system having an equipment-grounding conductor.
Make sure a disconnect is available for the operator.
During hard-wiring of the machine, make sure the fuses
have been removed or the breakers have been tripped
in the circuit to which the band saw will be connected.
ALWAYS FOLLOW PROPER LOCK-OUT/TAG-OUT PRO-
CEDURES.
8.0 COOLANT
Cutting fl uid or coolant must be supplied by the operator.
See sect. 14.4 for information.
Содержание Elite ECB-1422V
Страница 19: ...19 ECB 1422V BASE ASSEMBLY ECB1422V...
Страница 24: ...24 Horizontal Band Saw SAW HEAD ASSEMBLY ECB1422V...
Страница 30: ...30 Horizontal Band Saw ELECTRICAL BOX ASSEMBLY ECB1422V...
Страница 32: ...32 Horizontal Band Saw HYDRAULIC SYSTEM ECB1422V...
Страница 34: ...34 Horizontal Band Saw 17 0 WIRING DIAGRAM...
Страница 35: ...35 ECB 1422V...
Страница 36: ...36 Horizontal Band Saw NOTES...