Jesco Lutz PVC GF-2 Скачать руководство пользователя страница 7

Intended use

7

© Lutz-Jesco GmbH 2016
Subject to technical changes.
161025

 BA-12204-01-V02

PVC GF-2 suction line

Operating instructions

3 Intended use

The PVC GF-2 suction line serves the safe removal of the dosing medium 
from a delivery package, level monitoring of the packaging and the safe 
return of the dosing medium, should the safety equipment be activated 
automatically.

Intended purpose

The PVC GF-2 suction line serves the removal of a dosing medium from a 
delivery package. It was developed for use together with dosing pumps.

Содержание Lutz PVC GF-2

Страница 1: ...ns Lutz Jesco GmbH 2016 BA 12204 01 V02 PVC GF 2 suction line Operating instructions Read the operating manual The user is responsible for installation and operation related mistakes Dosing Conveying...

Страница 2: ......

Страница 3: ...s 4 1 3 Explanation of the warning signs 4 1 4 Identification of warnings 4 1 5 Instruction for action identification 5 1 6 General safety precautions 5 2 General 6 3 Intended use 7 4 Product descript...

Страница 4: ...this operating manual Signal words illustrate the gravity of possible injuries if the risk is ignored Signal word Meaning DANGER Refers to imminent danger Ignoring this sign may lead to death or the m...

Страница 5: ...p with no follow up action 1 First step in a series of steps 2 Second step in a series of steps 4 Result of the above action Action completed aim achieved 1 6 General safety precautions WARNING Chemic...

Страница 6: ...g level of the packaging is too low Personal protective equipment Based on the degree of risk posed by the dosing medium and the type of work you are carrying out you must use corresponding protective...

Страница 7: ...ion line serves the safe removal of the dosing medium from a delivery package level monitoring of the packaging and the safe return of the dosing medium should the safety equipment be activated automa...

Страница 8: ...4 1 Scope of delivery Please compare the delivery note with the scope of delivery The following items are part of the scope of delivery n Suction line inc K60x6 cover n Hose 5 m 4 2 Design Fig 1 Desi...

Страница 9: ...minal diameter DN 4 Capacity up to 25 l h Hose 4 mm Max ambient temperature 5 40 C Max temperature of the medium 35 C Electrical load capacity of the level monitoring Umax 50 V DC 50 V AC Imax 0 5 A P...

Страница 10: ...the connection of the suction line and the dosing pump 2 Connect the suction connection pos 1 with the valve and connection suction side of the dosing pump and tighten all union nuts by hand 3 Connect...

Страница 11: ...ered if the suction line level monitoring system GF 2 is triggered If the dosing pump is stopped by the level monitoring system this can only be read on the dosing pump display The GF 2 suction line s...

Страница 12: ...ce 12 Lutz Jesco GmbH 2016 BA 12204 01 V02 PVC GF 2 suction line Operating instructions 8 Maintenance Maintenance work to be carried out Frequency Visual inspection With use daily Table 5 Maintenance...

Страница 13: ...eason for repair Dosing medium Description Irritating Yes No Properties Corrosive Yes No We hereby certify that the product has been cleaned thoroughly inside and outside before returning that it is f...

Страница 14: ...any Phone Date Address Contact person Manufacturer order no Date of delivery Device type Serial number Nominal capacity nominal pressure Description of fault Service conditions of the device Point of...

Страница 15: ......

Страница 16: ......

Отзывы: