![Jerr-Dan MPL Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/jerr-dan/mpl/mpl_operation-supplement-manual_644880012.webp)
5-376-000106
REV. 0 - 09/07
27. Disassemble the tow sling buy
removing the strap assemblies
and the upper anchor cross bar
and stowing them in the toolbox.
28. Remove the winch cable from the
underlift sheave and stow the
hook on the roller guide. Remove
the sheave assembly from the
underlift and stow it in the toolbox.
29. Turn the “CAM” handles on the
hold back bars 90° to the locked
position.
30. Remove the pins from the hold
back bars at the rear of the body
then slide the hold back bars into
there fully retracted and locked
position. Move the lower anchor
assembly aside.
31. Fold the underlift to the ground.
Lift the lower anchor assembly
into the cradle bracket on the
knee boom.
Ea
st
ern
W
re
cke
r Sa
le
s
In
c