116
F I N A L C H E C K
All packaging removed from the residence
Columns plugged in, powered on and operating
at peak performance
Columns leveled
Panels aligned and rechecked after 20
minutes operation
Water supplies properly connected
with no leaks
Water filters installed (not applicable with
reverse osmosis system)
Water dispensers and/or ice makers working
Any problems with installation or parts reported
to JennAir Epicenter
OW N E R WA L KT H R O U G H
If the owner is present, provide them with the
User Guide. Guide the owner through:
Control panel functions
App and WiFi setup
Discarding first few batches of ice
Replacing the water filters
Registering their columns
How to contact JennAir Epicenter through
jennair.com or at 1-800-JENNAIR (536-6247)
COMPLETE
INSTALLATION
16
Содержание JBRFR24IGX
Страница 25: ...25 1 C O L U M N S ...
Страница 32: ...32 2 J O I N K I T ...
Страница 33: ...33 2 1 2 2 FIRST COLUMN ALIGN AND ADHERE HEATER PLUG HEATER INTO COLUMN 1 2 3 1 2 3 2 PREPARE JOIN KIT ...
Страница 37: ...37 3 P O S I T I O N I N G B R A C K E T ...
Страница 40: ...40 4 b D s S B R A C K E T I N S T A L L A T I O N ...
Страница 48: ...48 4 15 COMPLETE 4 2 4 11 1 2 3 BADASS BRACKET INSTALLATION 4 ...
Страница 49: ...49 5 F U R N I T U R E ...
Страница 55: ...55 6 f I R S C O L U M N I N S T A L L A T I O N ...
Страница 56: ...56 FIRST COLUMN INSTALLATION 6 6 1 SWITCH POWER OFF BEFORE PLUGGING IN COLUMN READ WARNING 1 2 3 ...
Страница 64: ...64 6 15 READJUST COLUMN SO THAT ALL DEPTHS MATCH 1 2 3 FIRST COLUMN INSTALLATION 6 ...
Страница 65: ...65 7 o N D C O L U M N I N S T A L L A T I O N ...
Страница 66: ...66 SECOND COLUMN INSTALLATION 7 7 1 SWITCH POWER OFF 1 2 3 BEFORE PLUGGING IN COLUMN READ WARNING ...
Страница 73: ...73 8 t H I R D C O L U M N I N S T A L L A T I O N ...
Страница 81: ...81 9 p R E C O L U M N S F O R U S E ...
Страница 85: ...85 9 7 EACH COLUMN TURN POWER ON 1 2 3 9 PREPARE COLUMNS FOR USE ...
Страница 87: ...87 10 t o e I c k C U S T O M W O O D P R E P A R A T I O N ...
Страница 90: ...90 11 t o e I c k S T A I N L E S S S T E E L P R E P A R A T I O N ...
Страница 92: ...92 11 3 AT TACH BLUE TOE KICK AND COLUMN WIRES 1 2 3 TOE KICK STAINLESS STEEL PREPARATION 11 ...
Страница 93: ...93 12 t o e I c k A L I G N A N D I N S T A L L ...
Страница 98: ...98 13 A L C U S T O M W O O D P R E P A R A T I O N ...
Страница 102: ...102 1 8 2 Square drive bit 1 2 3 13 7 ENSURE SPACE OF 1 8 3 2 MM PANEL CUSTOM WOOD PREPARATION 13 ...
Страница 103: ...103 14 A L S T A I N L E S S S T E E L P R E P A R A T I O N ...
Страница 106: ...106 15 A L H A N G A N D A L I G N ...
Страница 108: ...108 L R 15 3 15 4 EACH COLUMN TIGHTEN TOP TWO FASTENERS EACH COLUMN LOOSELY DRIVE IN TWO BOT TOM FASTENERS 1 2 3 1 2 3 ...
Страница 112: ...112 15 11 EACH COLUMN REINSTALL BRACKET TRIMS 1 2 3 PANEL HANG AND ALIGN 15 ...
Страница 113: ...113 16 c p l t I N S T A L L A T I O N ...
Страница 115: ...115 16 COMPLETE INSTALLATION 16 3 EACH COLUMN REMOVE FILM 1 2 3 BEFORE FINAL CHECK READ WARNING ...