WE ARE HERE TO SURPRISE!
2
INDEX
1. Important safe
ty instructions……………………………….…3~6
1.1 Important notices
1.2 Qualified personnel
1.3 Danger notices
1.4 Condition notices
1.5 Warning signs
1.6 Level of sound pressure
1.7 Training
2. Overview
of the machine………………………………………6~7
2.1 Product introduction
2.2 Technical data
2.3 Construction of the lift
3. Installat
ion instruction…………………………………………7~13
3.1 Preparation before installation
3.1.1 Tool and equipments needed
3.1.2 Parts check
3.1.3 Floor specifications
3.2 Precautions during installation
3.3 Installation
3.4 Check list after installation
4. Operation instruction…………………………………………14~21
4.1 Precautions during operation
4.2 control box panel description
4.3 Flow chart for operation
4.4 Operation
4.5 Emergency lowing when the power is off
5. Troub
le shooting………………….……………………………21~22
6. Maintenance…………………………………………………….22~23
7.
Annex…………………………………………………….………23~31
Annex1. Shipping sheet
Annex2. Overall diagram
Annex3. Space required
Annex4. Hydraulic connection
Annex5. Wiring diagram
Annex6. Exploded drawing parts
Annex7. Spare parts list
Annex8. Size and weight requirement for the vehicle & valve board diagram
Annex9. CE Certificate
Содержание JA4200T-C
Страница 25: ...WE ARE HERE TO SURPRISE 25 ANNEX5 Wiring Diagram ...
Страница 34: ...WE ARE HERE TO SURPRISE 34 Annex9 CE Certificate ...
Страница 35: ...WE ARE HERE TO SURPRISE 35 ...