Jema Autolifte – Denmark
- WE ARE HERE TO SURPRISE!
7
3.2 Precautions during installation
3.2.1 Make sure the two posts are vertical to the floor.
3.2.2 Oil hose and wire rope connection should be correct, make sure the joints are tight.
3.2.3 All the bolts connection should be tight.
3.2.4 Do not place any vehicle when try running the lift.
3.3 Installation
Step one: Remove the packing materials, take out the parts carton and cover plate.
Step two
:
Remove the packing brackets and bolts holding the two columns together.
Attention
:
Be careful in this step, in case the posts fall down &the personnel or the parts are damaged.
Step three
:
Remove the first post and place a supporter under the second post, then remove the bolts.
Step four: Decide the installation position of the columns, erect the main and assistant post. Pay attention
that the width between posts is 2780MM
1. Determine which side will be the main post to mount the power unit and the other assistant post.
2. Once the location is selected, use a chalk line to layout a grid for the post locations and make an outline of the posts on the
floor at each location.
3. Before proceeding, double check measurements and make certain that the bases of each column are square and aligned
with the chalk line.
2780
Содержание JA3500T
Страница 20: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 20 ANNEX 2 Overall Diagram ...
Страница 22: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 22 Annex5 Wiring diagram Single phase ...
Страница 31: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 31 ...
Страница 32: ...Jema Autolifte Denmark WE ARE HERE TO SURPRISE 32 ...