Current instructions at www.jeco-inc.com
1-800-893-3006
Page 2 of 3
To Assemble:
Step 1:
Route the pre-assembled water hose on the top pot (A) to the bottom (B).
Step 2:
A:
Carefully attach the pump (C) to the hose, making sure to place the pump in the center
of the bottom (B).
B:
Carefully connect the two LED lights (D) to the light cable comes out from pump (C),
making sure both parts connect securely.
Step 3:
Fill the basin (B) with clean water, making sure the pump (B) is fully submerged.
Note:
The maximum water level should be approximately 1.2 inches below the top edge of
the basin (B).