Current instructions at www.jeco-inc.com
1-800-893-3006
Page 2 of 3
To Assemble:
Step 1:
Route the pre-assembled water hose on the top rock (A) through the right hole on
the bottom rock (B), then align the top rock (A) to the bottom rock (B), making sure the
both parts line up.
Step 2:
A:
Attach the pump (C) to the hose, making sure to place the pump in the center of the
bottom (B).
B:
Carefully connect the LED light (D) to the light cable comes out from pump (C),
making sure both parts connect securely.
Step 3:
Fill the basin (B) with clean water, making sure the pump (C) is fully submerged.
Note:
The maximum water level should be approximately 1.2 inches below the top edge of
the basin (B).