85/116
BATTERY SWITCH
The electricity onboard is 12 V DC.
The electrical system consists of service batteries. The batteries supply power to all the
functions on board. The engine has its own battery.
Switch on by turning the battery switches (12 V).
BATTERIES
The a.c. generator connected to the engine is used to charge the battery.
Keep the batteries charged enough (essential to ensure them a correct service life).
The discharge of the batteries must not exceed 70 % of the rating.
Use the battery charger when in a marina in order to start sailing with properly charged
batteries (optional).
Always check the condition of the batteries and charge system before putting to sea.
PRECAUTION
Switch off all the battery switches when the boat is unattended.
PRECAUTION
Never run the engine when the circuit to charge the batteries is disconected (it may destroy
the a.c. generator).
8
ELECTRICAL CIRCUITS
Содержание SUN ODYSSEY 36I
Страница 1: ...SUN ODYSSEY 36I OWNER S MANUAL C ROISIERE 902651 Index J...
Страница 2: ......
Страница 8: ......
Страница 9: ...5 116 5 1 3 5 2 ISO 10 240 SPECIFICATIONS AND WARRANTY SPECIFICATIONS YOUR BOAT 1...
Страница 14: ......
Страница 16: ...12 116 5 3 3 d ISO 10 240 POSITION OF THE LIFERAFT Note If over 10 persons on board 2 liferafts compulsory...
Страница 24: ...20 116 5 3 3 h ISO 10 240 EMERGENCY TILLER...
Страница 26: ......
Страница 28: ......
Страница 34: ......
Страница 40: ......
Страница 44: ......
Страница 46: ...42 116 5 3 2 ISO 10 240 STANDING RIGGING...
Страница 48: ......
Страница 66: ......
Страница 68: ......
Страница 69: ...65 116 5 3 5 4 5 5 ISO 10 240 ACCOMMODATIONS MAINTENANCE FABRICS 6...
Страница 70: ...66 116 5 3 1 ISO 10 240 2 CABINS 3 CABINS...
Страница 74: ......
Страница 78: ...74 116 5 3 3 a 5 3 3 g ISO 10 240 THRU HULL FITTING Thru hull fitting closed Thru hull fitting open...
Страница 86: ......
Страница 90: ......
Страница 96: ......
Страница 104: ...100 116 ENGINE WATER INTAKE VALVE Thru hull fitting with engine water inlet valve...
Страница 110: ......
Страница 111: ...107 116 5 2 5 3 5 4 ISO 10 240 LAUNCHING LAUNCHING RECOMMENDATIONS STEPPING THE MAST 10...
Страница 114: ......
Страница 115: ...111 116 5 3 5 4 5 5 ISO 10 240 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11...
Страница 118: ......
Страница 120: ......