Chapter 5
FT1 Test Commands
Description of FT1 test commands
CT-650 Command-Line Reference Guide
Release 9.4
57
– The serial communications link between the CT-650 and DCS
must have administrative or supervisor rights given to the link to
allow degrooming and grooming of the digroup being tested.
– Establishing the
UF_Split
may take several minutes to complete
while the digroup is degroomed and regroomed for testing. The
process also includes storing the digroup configuration on the
CT-650. The disconnect process returns the digroup back to its
original configuration and/or mapping.
Содержание CT-650
Страница 1: ...CT 650 Wideband Test Unit Release 9 4 Command Line Reference Guide ...
Страница 2: ......
Страница 3: ...CT 650 Wideband Test Unit Release 9 4 Command Line Reference Guide ...
Страница 4: ......
Страница 22: ...Contents xxii CT 650 Command Line Reference Guide Release 9 4 ...
Страница 104: ...Chapter 7 DS0 VF Test Commands Description of VF test commands 78 CT 650 Command Line Reference Guide Release 9 4 ...
Страница 108: ...Chapter 8 Batch Files Unavailable commands for batch files 82 CT 650 Command Line Reference Guide Release 9 4 ...
Страница 198: ...Appendix A Test Results Definitions Loopback status information 172 CT 650 Command Line Reference Guide Release 9 4 ...
Страница 240: ...Appendix D Customer Services and Support Training options 214 CT 650 User s Guide Release 9 3 ...
Страница 247: ......