8- DAILY OPERATION
36
QUANTUM TOUCH
Caution
8.7 Switching on the dispenser
1. Open the water tap and Insert the
power plug. The dispenser starts heating
up water and starts cooling down the
cooling compartment. Drink delivery will
be blocked until the water in the boiler
has reached the correct temperature. A
flashing thermometer and the warning -
"Boiler is heating up, please wait.“ will be
shown on the display.
2. Once the water has reached the preset
temperature, the display shows the home
screen. The dispenser is now ready for
operation.
Ensure that the dispenser is connected to the water supply.
NOTE:
Depending on the dispenser model (see "Technical Specifications" ) and the ambient
temperature, the heating of the boiler can take between 10 and 30 minutes. The
cooling of the product compartment can take 20 hours or more.
i
NOTE:
If the dispenser has been shut down for longer periods, the date and time must be set,
so that the dispenser and the programmed cleaning cycles are reactivated.
i