Installation, unpacking

4.

check instrument for any damage caused by shipping.

If any damage is established, contact the carrier and dis-

tributor immediately.

check instrument and any other parts against order.

Installation instructions

5.

Disconnect mains before working on electrical part

of equipment.

The equipment has to be connected and grounded

according to the local rules and regulations.

The flange temperature must not exceed 200°c.

Otherwise a change of construction is necessery,

eg. use of a thermal spacer.

Please consider Ex temperature class!

The probe mounting has to be done always with a

minimum inclination of 5° towards the sampling pipe.

This is necessary to prevent a possible flow back

from condensate into the probe.

Mounting

5.1.

Mount probe with gasket on the process flange.

Take care for correct mounting angel according tech-

nical specification.

Mount 1/8“ NPT male connector at sample gas out-

let.

Attach heated sample line on probe enclosure with

moveable PG<2 cable conduit or mounting clamp.

connect the line with the connector fitting gas-tight.

PG <2

Mounting clamp

NOTE

The heated sample line must be strain relieved and must

not be hung on the fitting 

CAUTION

Never use grease for mounting sample pipe!

for models with back purge port:

connect tube with inert air coming from back purge valve box

JES-301kE1 gas-tight with back purge port.

Installation, Sichtkontrolle

4.

Nach dem Auspacken ist das Gerät auf allfällige Trans-

portschäden zu untersuchen. Wurde ein Schaden fest-

gestellt, sind unverzüglich die verantwortliche Spedition

und der händler zu benachrichtigen.
Es ist zu überprüfen, ob die Gerätelieferung Ihrer Bestel-

lung entspricht.

Installationsvorschriften

5.

Bei Arbeiten am elektrischen Teil des Gerätes ist es

vom Netz zu trennen.

Das Gerät muss entsprechend den örtlich geltenden

Vorschriften angeschlossen und geerdet werden.

Die Flanschtemperatur darf 200°c nicht überschrei-

ten, sonst ist eine konstruktive Änderung, z.B: Ein-

satz  eines  Thermal  Spacers,  notwendig.

Temperaturklasse hinsichtlich Ex-Zone beachten!

Die Sonde muss immer mit einer Mindestneigung

von 5° gegen das Entnahmerohr hin montiert wer-

den. Dies ist erforderlich um einen allfällig möglichen

Rückfluss des kondensates in die Entnahmesonde

zu verhindern.

Montage

5.1.

Sonde mit Dichtung am Prozessflansch montieren.

Einbauwinkel gemäß technischer Spezifikation be-

achten.

1/8“ NPT Einschrauber am Messgas Ausgang mon-

tieren.

Beheizte Messgasleitung mit verschiebbarer PG<2

oder Montageschelle am Gehäuse befestigen und

mit dem Einschrauber gasdicht verbinden.

PG <2

Montageschelle

HINWEIS

Die beheizte Messgasleitung muss zugentlastet werden

und darf nicht am Fitting abgehängt werden.

VORSICHT

Niemals Fett bei der Montage des Entnahmerohrs ver-

wenden!

Bei Modellen mit Anschluss für Rückspülung:

Schlauch mit inertem Gas von der Ventilbox JES-

301kE1 mit dem Anschluss für Rückspülung gasdicht

verbinden.

BA_DE_JES301E1_v3.1

––––––––––––––– 

[ 12 / <0 ]

–––––––––––––––––

Manual JES-301E1/JES-301E1SV

  

 

 

 

 

 

 

     

+

+

+

+

   

+

+

+

+

+

+

  

 

 

 

 

 

 

++/ +

' !%+9! !+!'9+9

'+9 %

9+ '+

+9 ! ' +! + + @ %0 > +8 8 A+ + 6/

$

+

+

+

+

+

+ +

+

+ + + + +

+ +

+ +

+

+ +

+

+ +

+

+

+ +

+ +

+

+

+

+

+

+ +

+

+

+

+

+

++

+

 

 

 

 

 

+

+ +

+

+

+

+

+

+

+ +

+ +

+

+ +

+ +

+ +

+

+ +

+ +

+ +

+

+ +

+ +

+

+

+

+

+

+

+

+

+

+

  

 

 

 

 

 

 

     

+

+

+

+

   

+

+

+

+

+

+

  

 

 

 

 

 

 

++

+

+

+

+

+

+ +

+

+

+ +

+

+ +

+

+

+

+

+

+ +

+

+ + + + +

+ +

+ +

+

+ +

+

+ +

+

+

+ +

+ +

+

+

+

+

+

+ +

+

+

+

+

+

++

+

 

 

 

 

 

+

+ +

+

+

+

+

+

+

+ +

+ +

+

+ +

+ +

+ +

+

+ +

+ +

+ +

+

+ +

+ +

+

+

+

+

+

+

+

+

+

+

Содержание JES-301E1

Страница 1: ...JCT ANALySENTEchNIk GMBh BEDIENUNGSANLEITUNG OPERATING MANUAL 11 17 JES 301E1 JES 301E1SV...

Страница 2: ...unpacking 12 5 Installation instructions 12 5 1 Mounting 12 5 2 Electrical connections 16 5 3 Terminal strip 16 6 Start up 17 7 Maintenance and service 18 7 1 Replacement of filter element 18 8 Demou...

Страница 3: ...hmesonden sind hochentwickelte Ger te die nur von qualifiziertem Personal bedient werden d r fen Es ist notwendig dass dieses handbuch von jenen die diese Ausr stung installieren benutzen bzw warten g...

Страница 4: ...opera ting parameters Description 2 Gas sampling probe JES 301E1 VORSICHT Die bestimmungsgem e Verwendung der Gasentnah mesonde JES 301E1 erschlie t sich nur auf den Einsatz in den daf r vorgesehenen...

Страница 5: ...BA_DE_JES301E1_v3 1 5 0 Manual JES 301E1 JES 301E1SV Gas sampling probe JES 301E1SV with process shut off valve Gasentnahmesonde JES 301E1SV mit Prozessabsperr ventil C...

Страница 6: ...l 8 kalibriergas Anschluss optional 9 R ckschlagventil 50 T Griff f r Absperrkugelhahn 53 Dichtung f r Entnahmerohr 5 Flanschdichtung 1 Flange 2 housing gasket 5 cylinder 6 Filter element screw 7 Filt...

Страница 7: ...inless steel Pyrex wool Optionen 2 1 Prozessabsperrventil Die Gasentnahmesonden JES 301E1SV sind mit einem Absperrkugelhahn zur rohgasseitigen Absperrung des Gasflusses ausgestattet werden Die Steueru...

Страница 8: ...ns with high thermal load Zus tzliche ATEX Heizelemente 2 2 2 Mit zus tzlichen heizelementen ist die Gasentnahme sonde auch f r tiefe Umgebungstemperaturen geeignet ATEX Heizer f r T4 2 2 3 Beheizungs...

Страница 9: ...92 1 1 0 oder 2 ANSI Flansch 150 lbs nach ASME B16 5 Messgaseingang G3 Innengewinde Messgasausgang 1 8 NPT Innengewinde kalibriergasanschluss Op tion 6 mm Rohrstutzen 1 01 R cksp lanschluss Option 6 m...

Страница 10: ...0 VAc 50 60 hz 10 Leistungsaufnahme pro hei zelement ca 80 W Einschaltstrom pro heizele ment ca 2 A 230 VAc ca A 115 VAc Einschaltdauer 100 Elektrischer Anschluss kabelverschraubung M20 x 1 5 Schraubk...

Страница 11: ...for the ex pected max pressure Gasfluss Diagramm 3 2 JES 301E1 nicht bei allen Modellen vorhanden Druck Temperatur Diagramm f r Prozessab 3 3 sperrventil VORSICHT Die Temperatur am Prozessabsperrventi...

Страница 12: ...rolle 4 Nach dem Auspacken ist das Ger t auf allf llige Trans portsch den zu untersuchen Wurde ein Schaden fest gestellt sind unverz glich die verantwortliche Spedition und der h ndler zu benachrichti...

Страница 13: ...lung ist die Bedienungsanleitung der Ven tilbox JES 301kE1 zu beachten Kalibriergasanschluss 5 1 1 Schlauch f r kalibriergas mit kalibriergasanschluss gasdicht verbinden BA_DE_JES301E1_v3 1 13 0 Manua...

Страница 14: ...Vertical duct installation 5 1 2 Horizontal duct installation 5 1 3 Montage an vertikalem Kamin 5 1 2 Montage an horizontalem Kamin 5 1 3 BA_DE_JES301E1_v3 1 1 0 Manual JES 301E1 JES 301E1SV...

Страница 15: ...Mounting positions 5 1 4 Mounting of In situ pre filter 5 1 5 Montagepositionen 5 1 4 Montage In situ Vorfilter 5 1 5 BA_DE_JES301E1_v3 1 15 0 Manual JES 301E1 JES 301E1SV...

Страница 16: ...appli Elektrischer Anschluss 5 2 rtliche Netzspannung Netzfrequenz und Leis tungsaufnahme mit den Angaben am Typenschild vergleichen In der Energieversorgungszuf hrung ist ein 2 poli ger Netzschalter...

Страница 17: ...es setzt sachgem en Transport fachgerechte Lagerung Aufstellung und Montage sowie sorgf ltige Bedienung und Instandhaltung voraus Anforderungen an die Qualifikation des Personals Qualifiziertes Person...

Страница 18: ...HINWEIS F r R cksp lung ist die Bedienungsanleitung der Ven tilbox JES 301kE1 zu beachten HINWEIS Die R cksp lung des Filters erfolgt von innen nach au en Daher kann etwas Staub im Filtergh use zur ck...

Страница 19: ...s in vice versa sequence 11 VORSICHT Das Geh use der Sonde kann sehr hei sein Bei Prozess berdruck k nnen explosive und oder toxi sche Gase austreten Entsprechende Ma nahmen sind bei Wartung und Ser v...

Страница 20: ...NWEIS Allf llige Geruchsbildung beim erstmaligen Aufheizen ist normal und stellt keinen Gew hrleistungsanspruch dar Neue Filterelemente und Dichtungen k nnen in den ers ten Stunden die Messergebnisse...

Страница 21: ...bmessungen 10 BA_DE_JES301E1_v3 1 21 0 Manual JES 301E1 JES 301E1SV 6 6 A 9 6 5 5 A 6 6 6 JCT 6 7 8 9 0 6 0 1 2 2 3 3 JES 301E1SV with process shut off valve JES 301E1SV mit Prozessabsperrventil JES 3...

Страница 22: ...22 35 00 00 JES 301E1S X X X X X 35 00 02 JES 301E1BS X X X X X X 35 00 0 JES 301E1cS X X X X X X 35 00 06 JES 301E1BcS X X X X X X X 35 00 2 JES 301E1SZ X X X X X 35 00 33 JES 301E1BSZ X X X X X X 35...

Страница 23: ...sse 1 4401 Accessories for gas connections SS316 35 90080 Einschrauber f r 6 mm Rohr 1 8 NPT Male connector for 6 mm tube 1 8 NPT 35 90081 Einschrauber f r 8 mm Rohr 1 8 NPT Male connector for 8 mm tu...

Страница 24: ...al L nge 1000 mm G3 4 a JER K10 sampling pipe Kanthal length 1000 mm G3 4 male thread 35 00051 JER K15 Entnahmerohr Kanthal L nge 1500 mm G3 4 a JER K15 sampling pipe Kanthal length 1500 mm G3 4 male...

Страница 25: ...4 a 3 m JHD S05V in situ pre filter SS316L with V deflector length 500 mm G3 4 male thread 3 m 35 00810 JHD S10V In Situ Vorfilter 1 4404 mit V Deflektor L nge 1000 mm G3 4 a 3 m JHD S10V in situ pre...

Страница 26: ...106 11 12 8 7 PTFE Filterkit bestehend aus 2 x PTFE Filterelement 2 x St tzscheiben 1 x St tzk rper PTFE filter kit consisting of 2 x PTFE filter elements 2 x support discs 1 x support shell 35 90107...

Страница 27: ...A 35 00665B x x ATEX Pilotventil Kit 115 VAC f r pneumatischen Aktuator mit Ventilstecker Bauform A ATEX solenoid pilot valve kit 24 115 VAC for pneumatic actuator with valve plug form A 35 00665C x x...

Страница 28: ...essungen ber alles 178 x 61 x 395 mm BxhxT Gewicht ca 13 8 kg Steuerdruck 2 10 barg Luftverbrauch 0 18 l h Medium Instrumentenluft nach ISO8573 1 klasse 1 2 1 Dimension over all 178 x 61 x 395 mm Wxhx...

Страница 29: ...ATEX 1116 X Neustadt den 28 04 201 Dipl Ing Martin Hess Gesch ftsf hrer Zertifikate PTC Heizelement 13 8 RQIRUPLWlWVHUNOlUXQJ 8 HFODUDWLRQ RI RQIRUPLW Wir We INTE INTERTEC Hes af R ffineriestra e 93 3...

Страница 30: ...Manual JES 301 BA_DE_JES301E1_v3 1 30 0 Manual JES 301E1 JES 301E1SV...

Страница 31: ...Certificates junction box JES 301E1 14 Zertifikate Klemmkasten JES 301E1 14 BA_DE_JES301E1_v3 1 31 0 Manual JES 301E1 JES 301E1SV...

Страница 32: ...order signed U Engel L S Dr Ing U Engel Regierungsdirektor UNCERTIFIED TRANSLATION Physikalisch Technische Bundesanstalt Braunschweig and Berlin Page 2 2 EC type examination Certificates without sign...

Страница 33: ...BA_DE_JES301E1_v3 1 33 0 Manual JES 301E1 JES 301E1SV...

Страница 34: ...BA_DE_JES301E1_v3 1 3 0 Manual JES 301E1 JES 301E1SV...

Страница 35: ...Certificates junction box JES 301E1SV 15 Zertifikate Klemmkasten JES 301E1SV 15 BA_DE_JES301E1_v3 1 35 0 Manual JES 301E1 JES 301E1SV...

Страница 36: ...BA_DE_JES301E1_v3 1 36 0 Manual JES 301E1 JES 301E1SV...

Страница 37: ...BA_DE_JES301E1_v3 1 37 0 Manual JES 301E1 JES 301E1SV...

Страница 38: ...Waldenburg 74638 Germany Attention Thomas Minde The products listed below are eligible to bear the CSA Mark shown Issued by PRODUCTS CLASS 3218 01 Class II Division 1 and 2 Groups EFG Class III 0 1 2...

Страница 39: ...7E7 Project B G Date Issued 3 57 B 75 E 1 B 7B BB B APPLICABLE REQUIREMENTS 2 B0 2 2 2 4 2 2 EG BB1B 1 8 H 1 EG 77 44 2 4 4 1 I 1 8 H 1 EG E 7B 44 2 4 4 1 2 31 8 H 7B07 B 44 2 4 2 1 BA_DE_JES301E1_v3...

Страница 40: ...r ATU 20559900 BA_DE_JES301E1_v3 1 0 0 Manual JES 301E1 JES 301E1SV Mehr Informationen zur JES 301E1V Serie finden Sie auf unserer Website Please refer to our website for more information on the JES 3...

Отзывы: