background image

NOTICE

 

Do not use earthing cable to hold weight of weather  
protection enclosure cover. 
 
To replace or clean the filter element, perform the  

following steps: 

Close process shut-off valve (option) 

1.

Switch off the power supply and wait until the  

2.

sample probe has cooled down:  
Remove the weather protection enclosure. 

3.

Turn away the t-handle (pos. 21) for pulling out the   

4.

filter element. Swing the pivoting lever sideways and 

pull out the support tube with the filter element. 
Loosen the filter element screw (pos. 6) from the 

5.

filter retainer (pos. 9). Pull out filter element and 

gaskets. 
Replace filter element (pos. 8) and/or gaskets (pos. 

6.

7). Clean groove on tighting piston of filter retainer 

(pos. 10) and remove O-rings (pos. 11 and 12) with 

O-ring tool or a non-metallic tool (wood or plastic 

wedge). 
Wet the new O-rings with a thin layer of PTFE paste, 

7.

fitting the smaller O-ring B from the filter side and 

the larger O-ring A from the cover side of the filter 

holder. 
Remount gaskets (pos. 7) and filter element (pos. 

8.

8). 
Screw on the filter element-screw (pos. 6). 

9.

Clean the sealing surfaces in sample probe. 

10.

Mount all other parts in vice versa sequence. 

11.
 

 

NOTICE 

New filter elements and sealings may influence the 
 measurement results. It is recommended to purge the 
sample probe diligently in heated condition. 
 

Demounting 

8.

Ensure zone clearance. 

Disconnect units supply at site. 

Take heated sample line regarding its operating 

manual out of  service. 
Disconnect fitting sample gas outlet from sample 

probe and loosen moveable PG 42 from cabinet and 
remove heated sample line. 
Ensure that sample probe can be removed from 

 process without endangerment. 
Remove sample probe from process flange. 

Disconnect cabinet grounding. 

Proper storage and disposal. 

HINWEIS

 

Deckel vom Wetterschutzgehäuse nicht am Erdungs-
band abhängen. 
 
Für den Austausch oder Reinigung der Filterelemente 
sind folgende Schritte vorzunehmen: 

Prozessabsperrventil (Option) schließen. 

1.

Elektrische Zuleitung abschalten und warten bis die 

2.

Gasentnahmesonde abgekühlt ist. 
Wetterschutzgehäuse abnehmen. 

3.

Durch Drehen des T-Griffs (Pos. 21) das Filter- 

4.

element herausziehen. Schwenkarm zur Seite  

klappen und Filterkolben herausziehen. 
Filterelementverschraubung (Pos. 6) vom Träger-

5.

element (Pos. 9) lösen. Filterelement und Flach-

dichtungen herausnehmen. 
Filterelement (Pos. 8) und/oder Flachdichtungen 

6.

(Pos. 7) ersetzen. Nut am Dichtkolben des Filter- 

halter Trägerelements (Pos. 10) reinigen und die 

zwei O-Ringe mit dem O-Ring Werkzeug oder 

einem nicht metallischen Werkzeug (Holz- oder 

Kunststoffkeil) entfernen (Pos. 11 und 12). 
Neue O-Ringe dünn mit PTFE-Paste benetzen, 

7.

dabei kleineren O-ring B von der Filterseite den  

größeren A von der Deckelseite des Filterträgers her 

aufziehen. 
Flachdichtungen (Pos. 7) und Filterelement (Pos. 8) 

8.

montieren. 
Filterelementverschraubung festziehen (Pos. 6). 

9.

Dichtungsflächen in der Gasentnahmesonde  

10.

reinigen. 

Anschließend erfolgt Montage in umgekehrter  

11.

Reihenfolge. 

HINWEIS

 

Neue Filterelemente und Dichtungen können in den  
ersten Stunden die Messergebnisse beeinflussen. Es 
wird empfohlen, die Gasentnahmesonde in aufgeheiz-
tem Zustand ausreichend zu spülen. 
 

Demontage 

8.

Zonenfreigabe sicherstellen. 

Gerät anlagenseitig spannungsfrei machen. 

Beheizte Messgasleitung gemäß dessen  

Bedienungsanleitung außer Betrieb nehmen. 
Fitting Messgas Ausgang an der Gasentnahme-

sonde lösen, verschiebbare PG 42 vom Gehäuse 
lösen und beheizte Messgasleitung entfernen. 
Sicherstellen, dass Gasentnahmesonde ohne  

Gefährdung vom Prozess getrennt werden kann. 
Gasentnahmesonde vom Prozessflansch  

ab-montieren. 
Erdungsanschluss vom Gehäuse trennen. 

Fachgerechte Aufbewahrung bzw. Entsorgung 

BA_DE_JES301E1_E1OS_v4.0

         

           ––––––––––––––– 

[ 23 / 44 ]

 –––––––––––––––––

Manual          JES-301E1/V & JES-301E1OS/V

Содержание JES-301E1/V

Страница 1: ...Date Stand 07 22 Heated Sample Probe Beheizte Gasentnahmesonde OPERATING MANUAL BEDIENUNGS ANLEITUNG OPERATING MANUAL BEDIENUNGS ANLEITUNG JES 301E1 V JES 301E1OS V...

Страница 2: ...pentabelle JHBEX 14 3 2 Modular und vielseitig 14 3 3 Service und Sicherheit 14 3 4 Druckverlauf 15 3 5 Gasfluss Diagramm 15 3 6 Druck Temperatur Verlauf Prozessabsperrventil 15 4 Installation Sichtko...

Страница 3: ...he operating manual as well as it is an essential part of the device Explanation of symbols 1 2 If a section of text is marked with one of the following warning symbols the danger described in the tex...

Страница 4: ...79 14 IEC EN 60079 17 IEC EN 60079 19 sch den f hren JCT bernimmt keine Haftung bei Nichtbeachtung der Sicherheitsvorrichtungen und der in dieser Bedienungsanleitung aufgef hrten Warn hinweise Dies gi...

Страница 5: ...t zur kontinuierlichen Entnahme von staub und aerosol haltigen Gasen bei extraktiven Analysensystemen Wasserdampf und hohe korrosive Gasfeuchte m ssen ber dem Taupunkt gehalten werden damit keine Ver...

Страница 6: ...down and back purge Zus tzliche Heizelemente 1 8 2 Zus tzliche Heizelemente machen die Gasentnahme sonde auch f r sehr niedrige Umgebungstemperaturen geeignet Heizer f r Temperaturklasse T4 1 8 3 Behe...

Страница 7: ...ange Anschlussspannung power supply Ex Zone Art Nr part no Modell model beheizt auf 120 C 2 m Keramik 2 m ceramic 0 2 m Keramik beschichtet 0 2 m ceramic coated Anschluss f r R cksp lung 1 Back purge...

Страница 8: ...COS X X X X X X 35 00407 JES 301E1BCOS X X X X X X X 35 00413 JES 301E1OSZ X X X X X 35 00405 JES 301E1BOSZ X X X X X X 35 00417 JES 301E1COSZ X X X X X X 35 00419 JES 301E1BCOSZ X X X X X X X Filtere...

Страница 9: ...Prozessabsperrventil BA_DE_JES301E1_E1OS_v4 0 9 44 Manual JES 301E1 V JES 301E1OS V 21 15 13 10 12 11 47 35 30 55 48 1 2 53 27 7 48 47 5 6 8 7 9 54 17 22 25 25 25 25 25 25 25 26 26 45 30 30 Abbildung...

Страница 10: ...Prozessabsperrventil BA_DE_JES301E1_E1OS_v4 0 10 44 Manual JES 301E1 V JES 301E1OS V 21 15 13 10 12 11 47 35 30 55 48 1 2 53 27 7 48 47 5 6 8 7 9 54 17 22 25 25 25 25 25 25 25 26 26 45 30 Abbildung z...

Страница 11: ...48 Kalibriergasanschluss optional 49 R ckschlagventil 50 T Griff f r Absperrkugelhahn 53 Dichtung f r Entnahmerohr 54 Flanschdichtung 1 Mounting flange 2 Enclosure gasket 5 Cylinder 6 Filter element...

Страница 12: ...150 lbs nach ASME B16 5 Messgas Eingang G3 4 Innengewinde Messgas Ausgang 1 8 NPT Innengewinde Kalibriergasanschluss Option 6 mm Rohrstutzen 1 4401 Anschluss f r R cksp lung Option 6 mm Rohrstutzen 1...

Страница 13: ...x mb IIC T4 Gb II 2D Ex mb IIIC T130 C Db mb IIC T4 Gb mb IIC T130 C Db Type of protection Pilot valves II 2G Ex h IICT6 Gb II 2D Ex h IIIC T80 C ia IIC T6 Ga tb IIIC T80 C Db IP65 Approval Sign heate...

Страница 14: ...Da IIIC T230 C Db IECEx BVS 20 0023X 2000 Zone 1 21 Zone 0 20 T3 T 200 C 60 C 150 C II 1 2G Ex db Ga IIC T3 Gb BVS 20 ATEX E 029 X II 1 2D Ex tb Da IIIC T200 C Db BVS 20 ATEX E 029 X Ex db Ga IIC T3...

Страница 15: ...ei neuem Filterelement Gasfluss Diagramm 3 5 JES 301E1 JES 301E1OS nicht bei allen Modellen vorhanden Druck Temperatur Verlauf Prozessabsperrventil 3 6 BA_DE_JES301E1_E1OS_v4 0 15 44 Manual JES 301E1...

Страница 16: ...Installation Sichtkontrolle 4 berpr fen Sie das Ger t auf eventuelle Transport sch den Offensichtliche Sch den sind unverz glich der verantwortlichen Spedition und dem H ndler zu melden Es ist zu ber...

Страница 17: ...luss 5 1 1 Instrumentenluftschlauch mit dem Anschluss f r R cksp lung gasdicht verbinden Kalibriergasanschluss 5 1 2 Schlauch f r Kalibriergas mit Kalibriergasanschluss gasdicht verbinden Montage am v...

Страница 18: ...Horizontal duct installation 5 1 4 Mounting positions 5 1 5 Montage am horizontalen Kamin 5 1 4 Montagepositionen 5 1 5 BA_DE_JES301E1_E1OS_v4 0 18 44 Manual JES 301E1 V JES 301E1OS V...

Страница 19: ...cher Anschluss 5 2 rtliche Netzspannung Netzfrequenz und Leis tungsaufnahme mit den Angaben am Typenschild vergleichen In der Energieversorgungszuf hrung ist ein Zwei poliger Netzschalter einzubauen d...

Страница 20: ...tries for a tight fit 7 Check for leaks Klemmleiste 5 4 Statuskontakte gem Anschlussschema anschlie en Es ist sicherzustellen das die potentialfreien Kontakte durch bauseitige Ma nahmen eigensicher be...

Страница 21: ...Vor dem Einschalten ist sicherzustellen dass die am Ger t eingestellte Betriebs und Netzspannung berein stimmen 8 Energieversorgung der Gasentnahmesonde einschalten Nach einer Vorlaufzeit von ca 120mi...

Страница 22: ...end Richtlinie 2012 19 EU ist das Ger t am Ende seiner Lebensdauer einer geordneten Entsorgung zuzuf hren Das Ger t enth lt Bauteile die wieder verwertet werden k nnen sowie Bauteile die speziell ents...

Страница 23: ...el vom Wetterschutzgeh use nicht am Erdungs band abh ngen F r den Austausch oder Reinigung der Filterelemente sind folgende Schritte vorzunehmen Prozessabsperrventil Option schlie en 1 Elektrische Zul...

Страница 24: ...operation conditions weather protection with thermal insolation not applied mount weather protection enclosure check electrical resistance of heater replace if necessary Unexpected measuments check O...

Страница 25: ...l Anschluss optional Back purge port optional Messgas Ausgang NPT1 8 innengewinde Sample gas outlet NPT 1 8 female thread Montageschelle Durchmesser 35 50mm oder 58 61mm Mounting clamp 35 50mm or 58 6...

Страница 26: ...p l Anschluss optional Back purge port optional Messgas Ausgang NPT1 8 innengewinde Sample gas outlet NPT 1 8 female thread Montageschelle Durchmesser 35 50mm oder 58 61mm Mounting clamp 35 50mm or 58...

Страница 27: ...schl sse 1 4401 Accessories for gas connections SS316 35 90080 Einschrauber f r 6 mm Rohr 1 8 NPT Male connector for 6 mm tube 1 8 NPT 35 90081 Einschrauber f r 8 mm Rohr 1 8 NPT Male connector for 8...

Страница 28: ...Kanthal length 1500 mm G3 4 male thread max 1250 C 35 00052 JER K20 Kanthal L nge 2000 mm G3 4 a max 1250 C JER K20 Kanthal length 2000 mm G3 4 male thread max 1250 C 35 00082 JER T05 PTFE L nge 500...

Страница 29: ...G3 4 male 3 m 35 00894 JHD H03V Hastelloy X mit V Deflektor L nge 330 mm G3 4 a 3 m JHD H03V Hastelloy X with V deflector length 330 mm G3 4 male 3 m 35 00895 JHD H05V Hastelloy X mit V Deflektor L ng...

Страница 30: ...nd B 1 x Filterelement Keramik 2 2 x Flachdichtung Viton Consumable parts kit consisting of 1 x O ring A and B 1 x filter element ceramic 2 2 x gaskets Viton 35 90101 11 12 8 7 Verschlei teilkit beste...

Страница 31: ...57 54 Flanschdichtung ANSI 2 f r Hochtemperatureinsatz SIL C 4430 Flange gasket ANSI 2 for high temperature applications SIL C 4430 35 00950 53 Dichtung f r Verl ngerungs Entnahmerohr 38 x 27 x 2 mm G...

Страница 32: ...BA_DE_JES301E1_E1OS_v4 0 32 44 Manual JES 301E1 V JES 301E1OS V...

Страница 33: ...BA_DE_JES301E1_E1OS_v4 0 33 44 Manual JES 301E1 V JES 301E1OS V...

Страница 34: ...BA_DE_JES301E1_E1OS_v4 0 34 44 Manual JES 301E1 V JES 301E1OS V...

Страница 35: ...BA_DE_JES301E1_E1OS_v4 0 35 44 Manual JES 301E1 V JES 301E1OS V...

Страница 36: ...nstalt notified body No 0102 in accordance with Article 9 of the Council Directive 94 9 EC of 23 March 1994 certifies that this equipment has been found to comply with the Essential Health and Safety...

Страница 37: ...e circuits EEx ia ib IIC IIB IIA T6 only for intrinsically safe circuits EEx ia ib IIC IIB IIA T5 for Tamb 55 C Technical data Rated voltage max 1100 V depending on the operating voltage range of the...

Страница 38: ...BA_DE_JES301E1_E1OS_v4 0 38 44 Manual JES 301E1 V JES 301E1OS V...

Страница 39: ...Certificates junction box 8146 16 Zertifikate Klemmenkasten 8146 16 BA_DE_JES301E1_E1OS_v4 0 39 44 Manual JES 301E1 V JES 301E1OS V...

Страница 40: ...BA_DE_JES301E1_E1OS_v4 0 40 44 Manual JES 301E1 V JES 301E1OS V...

Страница 41: ...BA_DE_JES301E1_E1OS_v4 0 41 44 Manual JES 301E1 V JES 301E1OS V...

Страница 42: ...BA_DE_JES301E1_E1OS_v4 0 42 44 Manual JES 301E1 V JES 301E1OS V...

Страница 43: ...LASS 3218 01 08 6 4 8 4 8 5 808 8 808 8 Class II Division 1 and 2 Groups EFG Class III 8378 78 8 8 78 380AD 8 8 D 18 A8 80AD 8 8 AA 18 8 38 9 38E78 78 PART 1 F 18 98 3 PART 2 F F8 3 8 84 3 8 8 8FFDD8...

Страница 44: ...Nr VAT No ATU20559900 Kreisgericht Wr Neustadt FN 119682 d Gesch ftsf hrer CEO G nter Zimmel Please refer to our website for more information about our products Mehr Informationen zu unseren Produkten...

Отзывы: