P/N 960-100929R_Rev. 7 {EDP #148849}
© 2017, JAPAN CASH MACHINE CO., LTD.
4 - 1 0
Section 4
iVIZION® Series Next-Generation Banknote Acceptor Unit
Disassembly/Reassembly
Validation Sensor Board
Assembly Removal
To remove the Validation Sensor Board Assembly,
proceed as following:
1. Remove the four (4) Cover Mounting Screws
a
1
to
a
4
) located on the base side of
the Validation Unit, and remove the
iVIZION
b
) off the Valida-
tion Assembly.
2. Remove the two (2) mounting Screws (Figure 4-
a
1
&
a
2
) and take Grounding Plate “A” (Figure
b
) off the Validation Unit.
3. Remove the two (2) screws (Figure 4-37
c
1
&
c
2
)
securing the Validation Sensor Assembly Board.
4. Unplug the two (2) FPC Cables (Figure 4-37
d
1
&
d
2
) and the two (2) FFC Cables (Figure 4-37
e
1
&
e
2
) from the Validation Sensor Assembly Board.
5. Take the Validation Sensor Board Assembly (Fig-
f
) off the Validation Unit.
Validation Sensor FPC Cable
Removal
To remove the Validation Sensor FPC Cables,
proceed as follows:
1. Remove the two (2) Validation Sensor FPC
Cables (Figure 4-38
a
1
&
a
2
) from the
Validation Unit.
Figure 4-36
Figure 4-36
iVIZION Head Cover A Removal
a
1
a
2
a
3
a
4
b
Validation Sensor Board Assembly
Figure 4-37
Validation Sensor Board Assembly
Removal
a
1
a
2
b
c
1
c
2
d
1
e
1
e
2
d
2
f
Figure 4-38
Figure 4-38
Validation Sensor FPC Removal
a
1
a
2
Dashed Line
for Fold Up
Solid Line
for Fold Down
NOTE: Carefully observe the Up and
Down Fold Line indications shown by
the two (2)
Cyan
Arrows in Figure 4-
38, and DO NOT unfold them in an
opposite direction!
NOTE: When installing new FPCs,
fold-up along the Solid Lines and
fold-down along the Dashed Lines
before setting them in place. Once an
FPC is folded, DO NOT unfold it back
again or fold in the opposite direction.
NOTE: When the Unit is
reassembled, the FPCs should be
reinstalled as illustrated by the
Blue
paths shown in Figure 4-39.
Figure 4-39
Figure 4-39
Validation Sensor FPC Reassembly