P/N 960-000164R_Rev. 3 {EDP #213631}
© 2018, JAPAN CASH MACHINE CO., LTD.
2 - 1 9
Installation
iPRO-RC™ Series Banknote Recycler
Section 2
Operational Flowchart (Continued)
Figure 2-17 depicts a typical iPRO-RC™ Validation flow process.
Figure 2-17
iPRO-RC Operational Flowchart (Validation)
b) Centering the Banknote
c) Transporting the Banknote
e) Stop Transportation
f) Is the Banknote authentic?
g) Returning the Banknote
h) Was Acceptance Inhibited?
a) Intake the Banknote
d) Sampling the Banknote Data
i) Sending Denomination Signal
k) Is the Banknote being stored in the Cash Box?
C2) To Figure 2-19 “Stacking/Cash Box” Flow on
page2-21 of this Service Manual
l) Return the Banknote.
j) Is the Banknote being stored in the Recycle Unit?
C1) To Figure 2-18 “Stacking/Recycle Unit” Flow on
page2-20 of this Service Manual
B1) Return from Figure 2-16 “Primary Sequence”
Flow on page2-18 of this Service Manual