Installation
UBA Pro RT/RQ™ Series Banknote Recycler
Section 2
© 2020, JAPAN CASH MACHINE CO., LTD.
2 - 2 3
RT/RQ Transporting to Recycler Flow Process
Figure 2-36
RT/RQ Transporting to Recycler
Figure 2-36
RT/RQ Transporting to Recycler Flow Process
C1) From “Accepting Banknotes” flowchart
c) Retried the transportation operation three (3) times?
d) Rotate the Anti-Pullback (PB) Unit
g) Sending an Acceptance VEND Signal
i) Is the Recycler full?
j) Stop operation. Sending FULL Signal (*2)
a) Transporting the Banknote to the Recycler
f) Stop operation (Abnormal Signal Output (*1)
b) Was the Banknote transported to the Recycler?
e) Was an Abnormal Error detected by the PB Unit?
h) Collecting the Banknote
A) Return to “A” Main flowchart (Figure 2-34)
a
b
A
C1
YES
NO
c
d
e
f
g
h
j
i
YES
YES
NO
NO
NO
YES
*1). When an abnormal signal is received, remove and re-supply Power to the RT/RQ Unit after resolving the problem, or send a
RESET Command from the Host Machine.
*2). When a Recycler(s) is full, the recyclable Banknotes are collected into the Cash Box until the “Full” detection is cleared. The
RT/RQ responds via Status Request from the Host Machine while it is performing when a Recycler(s) is full.
Содержание UBA Pro RT Series
Страница 10: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 195: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD...
Страница 196: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro RT RQ Series Banknote Recycler Issue 4115 SME 01 00...