This section provides installation and operating
instructions for the UBA Pro RT/RQ™ Series
Banknote Recycler (RT/RQ). The information
within contains the following features:
Standard Interface Circuit Schematics
Installation Procedure
Holes are provided in each Frame Unit to accom-
modate mounting the RT/RQ Unit
during installa-
tion. Select and perform the following steps
required to install the RT/RQ Unit.
Grounding
1. Install the Toothed Washer (Figure 2-1
a
), the
Grounding Wire (Figure 2-1
b
) and then the
Screw (Figure 2-1
c
) into the Frame Ground (Fig-
) in order.
2. Tighten the Screw to secure the Wire and Washer.
Side Installation (For Standard and
Stacking Up (SU) Installation types)
When a side mounting configuration is preferred,
per-
form the following procedure:
1. Secure the left and right side of the RT/RQ Frame
into its intended location using 8 (eight) M4
Screws from each side of the Frame (Figure 2-2
a
1
through
a
8
).
2 INSTALLATION
NOTE: Do Not exert external pressure
on the UBA Pro Unit. Strong pressure
on the Unit may cause the Unit‘s
performance to degrade.
NOTE: Ensure that there is sufficient
space to open, clean and maintain a UBA
Pro Unit (Refer to “Unit Dimensions” on
page 1-9).
Caution: Be sure to use specified Screw
Holes when installing the Unit.
Caution: To keep the Unit’ performance
optimal, ensure that the mounting
location is horizontally at 0 degrees on a
flat surface and strong enough to
ensure the Unit weight.
Caution: Be sure to connect the Frame
Housing to the Frame Ground of the
Host Machine.
NOTE: Prepare the following Grounding
Wire, Screw and Washer for grounding:
•
Grounding Cable with Conductor Diameter
1.6mm or lager
•
M4 W Washer (Large) Pan Head, Iron/
Chromium (III), 12mm or shorter
•
Toothed Washer
•
Tightening Torque: 120N·cm
NOTE: Refer to “Unit Dimensions” on
page 1-9) for each Frame Ground
location.
Figure 2-1
Figure 2-1
Grounding
Edge Side
Round Side
a
b
c
d
NOTE: Prepare the following Screw:
•
M4 Screw (the length of each M4 Screw
should not extend more than 6mm long
from the inside of the Frame)
•
Tightening Torque: 120N·cm
Содержание UBA Pro RT Series
Страница 10: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD viii THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 195: ...UBA Pro RT RQ Series Banknote Recycler P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD...
Страница 196: ...P N 960 000213R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro RT RQ Series Banknote Recycler Issue 4115 SME 01 00...