P/N 960-100925R_Rev. A {EDP #186705}
© 2010, Japan CashMachine Co, Limited
7
Transaction Based Validator Integration Guide
3 INSTALLATION
Installation Process
Perform the following steps to install the TBV
Unit:
1. Place the TBV in its intended mounting location.
2. Bolt both the right and left sides of the TBV
Frame into its intended location using 8 Pan Head
Screws (4 on each side) from outside of the
Frame when this particular mounting configura-
tion is preferred (See Figure 7).
3. Remove the Cash Box and bolt the back side and
bottom side of the TBV Frame into its intended
location using 8 (eight) M4 Pan Head Screws
from the outside of the frame when this mounting
configuration is preferred (See Figure 8).
4. Connect the TBV Unit to the Host Machine using
a packaged Harness, and then supply the power.
DIP Switch Configurations
This portion provides the denomination value DIP
Switch Block settings for the TBV Unit.
Figure 7
M4 Screw Locations (Right & Left Sides)
NOTE: The maximum length of the M4 Pan Head
Screws should be 4mm plus the thickness of the
Cabinet or mounting Bracket (See “TBV Entire
Unit Outside Dimensions” on page 27 of this
Guide to confirm each Screw pitch condition).
Figure 8
M4 Screw Locations (Bottom & Rear
Sides)
Table 8
BNF Set Vend Denomination Switches
DS1
Switch No.
Switch ON
Switch OFF
1
VEND 1 INHIBIT
VEND 1 ACCEPT
2
VEND 2 INHIBIT
VEND 2 ACCEPT
3
VEND 3 INHIBIT
VEND 3 ACCEPT
4
VEND 4 INHIBIT
VEND 4 ACCEPT
5
VEND 5 INHIBIT
VEND 5 ACCEPT
6
VEND 6 INHIBIT
VEND 6 ACCEPT
7
VEND 7 INHIBIT
VEND 7 ACCEPT
8
N/A
*
*. Not Applicable (N/A). Never Switched to ON.
OFF (Fixed)
Table 9
Set BNF Buzzer Volume Switches DS2
Switch
No.
Switch ON
Switch OFF
1
N/A
*
*. Not Applicable (N/A). Never Switched to ON.
OFF (Fixed)
2
Performance Buzzer ON
Performance Buzzer
OFF
3
ON Fixed
N/A*
4
N/A*
OFF (Fixed)
Table 10
TBV Set Vend Denomination Switches
DS3
Switch No.
Switch ON
Switch OFF
1
VEND 1 INHIBIT
VEND 1 ACCEPT
2
VEND 2 INHIBIT
VEND 2 ACCEPT
3
VEND 3 INHIBIT
VEND 3 ACCEPT
4
VEND 4 INHIBIT
VEND 4 ACCEPT
5
VEND 5 INHIBIT
VEND 5 ACCEPT
6
VEND 6 INHIBIT
VEND 6 ACCEPT
7
VEND 7 INHIBIT
VEND 7 ACCEPT
8
N/A
*
*. Not Applicable (N/A). Never Switched to ON.
OFF (Fixed)
NOTE: To install the TBV Unit into a Host
Machine, affix at least two of the four side
dimension in place.
ON
OFF
DS1
OFF
DS2
ON
NOTE: When installing the BNF Section onto the
TBV-100 Unit, DIP Switch #3 settings will have no
effect. In this case, DIP Switch #1 on the BNF
Section must therefore be used for setting the
required denomination.
DS3
OFF
ON