RS T4F Diesel Generator | G70RS – G125RS
13
Control panel – DEIF
Stand Alone Manual Operation
Single generator, controlled manually through
its generator controller. Load is monitored by
the operator.
Starting Procedure
Perform all the pre-start checks before starting
the generator.
1.
Set the MCCB to ‘off’ position.
2.
Check all cabling connection and make sure
that all safety devices are functional.
3.
Turn the battery isolator to ‘on’ position.
4.
Controller will start the initialling process.
5.
Press the ‘stop/reset’ button to clear any alarms.
6.
Press the ‘semi auto mode’ button.
7.
Press the start button. The generator
controller displays the start-up sequence.
8.
After a short delay the engine will crank for up
to ten seconds followed by another ten second
pause. This cycle will repeat up to three times
until the engine runs smoothly. If the engine
does not start within this cycle the generator
controller will display ‘fail to start’.
9.
Check the voltage displayed on the genset
controller.
10.
Close the main circuit breaker. The generator
breaker LED will illuminate.
11.
The power available indicator lamp will illuminate.
REMEMBER: Before stopping the
generator set, remove all electrical
load ensuring all consumers are
aware of the loss of power prior
to shutdown.
Stopping Procedure
Perform the procedure below to stop the
generator:
1.
Turn off all loads to the generator.
2.
Open the main circuit breaker. The power
available lamp will go off.
3.
Press the ‘stop/reset’ button once. The
generator will stop after the specified cooling
time. Duration: 5min.
4.
If ‘stop/reset’ button is pressed again the
generator will stop immediately.
5.
The ready to load and generator available
LED indicators will go off.
6.
Turn the battery isolator to ‘off’ position after
the engine has stopped.
Auto and Load Sharing Operation
Remote start and synchronizing multiple sets
must only be set up by a suitably trained and
competent person. Please refer to the operator
manual for more detailed instructions.