2
TABLE OF CONTENTS
Parts
4-5
Step 1 Mounting Hinges
6
Step 2 Right Side Panel to Back Side Panel
6
Step 3 Front Support Panel & Left Side Panel
7
Step 4 Bottom Panel to Stand
8
Step 5 Top Panel to Cabinet
9
Step 6 Shelf to Cabinet
10
Step 7 Door to Left Panel
11
Step 8 Mount Cabinet Fee
12
Warranty
16
Содержание CNT-10B
Страница 1: ...WWW JBJLIGHTING COM ...
Страница 3: ...3 ...
Страница 12: ...12 STEP 8 Mounting Cabinet Feet Align the Cabinet Foot to mounting holes on the Bottom Panel and mount ...
Страница 13: ...13 ...
Страница 14: ...14 ...
Страница 15: ...15 ...