background image

PHSK

Small Preheater Set

INSTRUCTION MANUAL

Содержание PHSK

Страница 1: ...PHSK Small Preheater Set INSTRUCTION MANUAL...

Страница 2: ...unit Ref PH218 Kapton Tape 1 unit Ref PH217 Manual 1 unit Ref 0026988 Small PCB Support 1 unit Ref PHS SA Small Preheater Unit 1 unit RJ45 Cable 1 unit Ref 0019914 Packing List The following items are...

Страница 3: ...r Socket Main Switch Fixing Brackets for Small PCB Support Preheater Unit Console 2 8 Color TFT Screen Start Stop USB B Connector Zone B Zone A RJ45 Connector to Preheater Unit USB A Connector Foot fo...

Страница 4: ...vel do as follows 22 mm 0 87 in 45 mm 1 77 in 65 mm 2 56 in Unscrew these knobs to place the support in the lowest level Low level High level Medium level Height Adjustment Use the fixing brackets to...

Страница 5: ...cement Removing the PCB Place large PCBs on the 4 rubber caps Reworking large PCBs Adjustable slot clamps for PCB fixation Placing another PCB Position it and tighten the sliding guide knobs The Small...

Страница 6: ...on the product page at www jbctools com Troubleshooting USB flash drive is connected Station is controlled by a PC Station is controlled by a robot Station software update Press INFO to start the proc...

Страница 7: ...or Printed Circuits and is committed to becoming the most recognized international industry association for the electronics manufacturing industry Fix with Kapton Tape Protection Thermocouple Setting...

Страница 8: ...ction Info Instant Power Supplied to Heater Status Indicator Work Mode Status Bar Thermocouple Selected Temp and Mode Control Protection Info Thermocouple Current Temp TC1 Current and Selected Tempera...

Страница 9: ...ocouples do not reach the control protection temperature limit Thermocouple current temp Thermocouple Selected Temp and MSode Control Protection Info Instant Power Supplied to Heater Status Indicator...

Страница 10: ...the same as long as the same working conditions are respected The profiles which already have the data from the Teach profile are marked with this symbol These profiles can be run either with or witho...

Страница 11: ...here are 3 profiles predefined by JBC A B and C The difference between them is the number of steps 2 3 or 4 The thicker your PCB is and the more layers it contains the more steps are needed to obtain...

Страница 12: ...Switch Y Axis Between Power and Temperature USB ash drive is connected Station is controlled by a PC Station is controlled by a robot System Notifications Station software update Press INFO to start t...

Страница 13: ...BC Update File from www jbctools com software html and save it on a USB flash drive Preferably one with no other files 2 Insert the USB flash drive to the console The icon is diplayed while updating F...

Страница 14: ...t hold the plug not the wire The temperature of accessible surfaces may remain high after the unit is turned off Handle with care Do not leave the appliance unattended when it is on Do not cover the v...

Страница 15: ...ure Profiles 3 profiles 2 3 or 4 steps User Profiles 20 up to 6 steps for each Maximum Work Time 600 min or indefinite Dimensions Weight 195 x 288 x 41 5 mm 1 74 kg L x W x H 7 68 x 11 34 x 1 63 in 3...

Страница 16: ...ranty covers this equipment against all manufacturing defects including the replacement of defective parts and labour Warranty does not cover product wear or misuse In order for the warranty to be val...

Отзывы: