NAU
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
C115
C11
C105 /
C105 / C115
NAU
Control Unit
PORT
2
ROBOT
PEDAL
2
NAU
Control Unit
PORT
2
ROBOT
PEDAL
2
NAU
Control Unit
PORT
2
ROBOT
PEDAL
2
PORT
1
PEDAL
2
C115
C11
C105 /
C105 / C115
NAU
Control Unit
PORT
2
ROBOT
PEDAL
2
NAU
Control Unit
PORT
2
ROBOT
PEDAL
2
Maintenance
Before carrying out maintenance, always switch the device off and disconnect it from the mains.
Allow the equipment to cool down.
- Clean the station screen with a glass
cleaner or a damp cloth.
- Use a damp cloth to clean the casing and
the tool. Alcohol can only be used to clean
the metal parts.
- Periodically check that the metal parts of
the tool and stand are clean so that the
station can detect the tool status.
- Maintain tip surface clean and tinned prior
to storage in order to avoid tip oxidation.
Rusty and dirty surfaces reduce heat
transfer to the solder joint.
- Periodically check all cables and tubes.
- Replace any defective or damaged pieces.
Use original JBC spare parts only.
- Replace a blown fuse as follows:
1.
Pull off the fuse holder and remove the
fuse. If necessary use a tool to lever it off.
2.
Press the new fuse into the fuse holder
and replace it in the station.
- Repairs should only be performed by a JBC authorized technical service.
Fuse holder
Fuse holder
Fuse
13
40 mm
50 mm
60 mm
80 mm
100 mm
130 mm
130 mm
para manuales - color gris
200 mm
300 mm
Содержание NAS
Страница 1: ...NAS 2 Tool Nano Rework Station INSTRUCTION MANUAL...
Страница 16: ...Notes 16...
Страница 17: ...Notes 17 40 mm 50 mm 60 mm 80 mm 100 mm 130 mm 130 mm para manuales color gris 200 mm...
Страница 18: ...Notes 18...