OK
EAR
THING FUSE
USE ONL
Y
WITH A 250
V FUSE
OK
EAR
THING FUSE
USE ONL
Y
WITH A 250
V FUSE
OK
EAR
THING FUSE
USE ONL
Y
WITH A 250
V FUSE
Fuse
holder
Before carrying out maintenance, always switch the device off and disconnect it from the mains.
Allow the equipment to cool down.
- Clean the station display with a glass cleaner or
a damp cloth.
- Use a damp cloth to clean the casing and the tool.
Alcohol can only be used to clean the metal parts.
- Periodically check that the metal parts of the
tool and the tool holder are clean so that the
station can detect the tool’s status.
- Maintain the tip surface clean and tinned before
storage to avoid tip oxidation. Rusty and dirty
surfaces reduce heat transfer to the solder joint.
- Periodically check all cables.
- Replace any defective or damaged pieces. Only
use original JBC spare parts.
- Repairs should only be performed by a JBC
authorized technical service.
- When this warning appears on the main
display, earthing fuse must be replaced.
- Replace a blown fuse as follows (applies to
both the earthing fuse and the main fuse):
1. Pull off the fuse holder and remove the fuse. If
necessary, use a tool to lever it off.
2. Insert the new fuse into the fuse holder and
return it to the station.
Maintenance
Clean
periodically
Main Fuse
Earthing Fuse
EARTH
FUSE
OK
No
Yes
14
Clean
periodically
Содержание CDN-9QF
Страница 1: ...INSTRUCTION MANUAL CDN High Precision Soldering Station...
Страница 16: ...Notes 16...
Страница 17: ...Notes 17 40 mm 50 mm 60 mm 80 mm 100 mm 130 mm 130 mm para manuales color gris 200 mm...
Страница 18: ...Notes 18...