Jaypro Sports RGB-3 Скачать руководство пользователя страница 4

A

RGB-3 - INSTALLATION MANUAL

www.jayprosports.com / (800) 243-0533 / 976 Hartford Tpke, Waterford, CT 06385 USA

SUBJECT TO CHANGES IN DESIGN AND MANUFACTURING

© COPYRIGHT 2023 JAYPRO SPORTS, LLC. ALL RIGHTS RESERVED

Sheet 4 of 5

II. Assemble and Install Lower Frame: 

 

1) 

Assemble the lower H-Frame on the ground as shown.

2) 

Using appropriate handling equipment, lift and place the H-Frame into the footings.

3) 

After plumbing the uprights and leveling the crossbar, securely brace the H-Frame, primarily in the 

front and back direction.

4) 

Pour the concrete, using a minimum 4,000 psi mix.

5) 

Allow concrete to cure for 48 hours, before installing the top upright.

NOTE: INSTALL CORNER CLAMPS
ONTO UPRIGHTS FIRST BUT DO 
NOT FULLY TIGHTEN HARDWARE 
UNTIL CROSSBAR IS INSERTED.

PLAYING SURFACE

0'-2" BELOW

PLAYING SURFACE

3/4" REBAR 
(SUPPLIED BY
INSTALLER)
6 PLACES

36 in

Ø

48 in

6 in

54 in

18'-4 1/2"

9'-10"

20'

8

3

1

7

7

n

7/16 in

REF 

REF Ø7/16 in

6

6

1

4

3

6

7

Отзывы: