Rev-A
Page 7 of 7
(AIR CRAFT CABLE)
(TYPICAL AT MID POST OF NET)
(TYPICAL AT 4 CORNERS OF NET)
(ATTACHES TO FIGURE: 5 THIMBLE OR FIGURE: 6 STEEL RING)
Страница 1: ...A Page 1 of 7 PROTF 70T PROTF 55T PROFESSIONAL BATTING TUNNEL Installation Instructions Call Jaypro Sports Equipment at 1 800 243 0533 during regular business hours for technical support www jaypro c...
Страница 2: ...KNUT ZP HN265 24 12 DESCRIPTION REV PART QTY ITEM 6 LONG GALV STEEL CLEAT HM6331 16 13 1 4 20 x 5 1 2 HEX HD SCREW ZP HS5077 16 14 1 4 20 NYLON LOCKNUT ZP HN256 24 15 3 16 CABLE THIMBLES HM251 8 16 3...
Страница 3: ...ZP HN265 30 12 DESCRIPTION REV PART QTY ITEM 6 LONG GALV STEEL CLEAT HM6331 20 13 1 4 20 x 5 1 2 HEX HD SCREW ZP HS5077 20 14 1 4 20 NYLON LOCKNUT ZP HN256 30 15 3 16 CABLE THIMBLES HM251 8 16 3 16 C...
Страница 4: ...ure 6 Install hardware on each pole as shown in Figure 3 Attach the hoisting ropes by feeding them through the pulleys Attach a spring clip 8 to the end of each hoisting rope as shown in Figure 4 Tie...
Страница 5: ...Rev A Page 5 of 7...
Страница 6: ...vary Local building codes should be adhered to if requirements are greater than those outlined here Allow the concrete to fully cure per the manufacturer s instructions no less than 24 hrs Note these...
Страница 7: ...Rev A Page 7 of 7 AIR CRAFT CABLE AIR CRAFT CABLE TYPICAL AT MID POST OF NET TYPICAL AT 4 CORNERS OF NET ATTACHES TO FIGURE 5 THIMBLE OR FIGURE 6 STEEL RING...