Jason International, Inc. •
501.771.4477
Page 3 of 5
Customer Service : 800.255.5766
CLEANING
1.
remove all loose debris.
Construction plaster or excess grout
can be removed with the use of a wooden-edged trowel.
2.
Paint or tar stains
can be removed with paint thinner,
turpentine, or isopropyl alcohol (rubbing alcohol). Never
allow the cleaner to soak against the acrylic surface for
long periods of time.
always rinse the surface immediately
following the use of cleaners.
NOTe:
Follow the manufacturers instructions for safe use
of cleaning products. If the surface becomes scratched
or dulled, it may be restored by using a quality plastic
polish, like Novus Plastic Polish No. 2 (available from
the Jason Dealer).
It is always preferable to protect the
acrylic surface during installation to minimize cleanup and
prevent surface damage.
Figure 1
BaTh wITh INTeGral TIle FlaNGe
SILICO NE BEAD
TILE
DRYW ALL
DRYW ALL
TILE
O PTIO NAL
TILE FLANG E
KIT
O PTIO NAL
INTEG RATED
TILE LIP
1" X 2"
[5 X 10 cm ]
SUPPO RT
FIG . 2
SCREW
Figure 2
Installation Instructions (cont.)
WATER TESTING
Before
finishing the installation, it is recommended that the
bath and plumbing tested for leaks.
1.
Fill and operate the bath.
Close the drain and fi
ll the bath
with at least two (2) inches of water. The incoming water
temperature should not exceed 104°F (40°C).
2.
Inspect the plumbing for leaks.