INSTALLATION INSTRUCTIONS (cont.)

CLeANING

1.

  Remove all loose debris

. Construction plaster or 

excess grout can be removed with the use of a wood 
(edge) trowel.

2. 

Paint or tar stains

 may need to be removed with a 

cleaner, such as paint thinner, turpentine, or isopropyl 
alcohol (rubbing alcohol). Never allow the cleaner to 
soak against the acrylic surface for long periods of time. 

Always rinse the surface immediately following the 

use of cleaners.

3.  Follow the manufacturer’s instructions for safe use of 

cleaning products. If the surface becomes scratched 
or dulled, it may be restored by using a quality plastic 
polish, like Novus Plastic Polish No. 2 (available from 
the Jason Dealer). 

It is always preferable to protect 

the acrylic surface during installation to minimize 

cleanup and prevent surface damage.

WATeR TeSTING

Before finishing the installation, it is recommended that the 
bath be water tested and the plumbing tested for leaks. 

1.  

Before water testing the bath

, make sure any pump 

unions are hand tight. Do not over tighten or use a pipe 
wrench. This will damage the unions and cause leaking. 
If the unit leaks with the unions hand tight, then loosen 
the union(s) and check the O-ring seal to ensure it is 
properly seated.

2.  

Fill and operate the bath

. Close the drain and fill the 

bath with water to at least 10 inches [25 cm] below the 
bath deck. The inlet temperature should not exceed 
140°F (60°C) as this could damage the acrylic surface. 
Refer to the 

FILLING AND DRAINING

 section of this 

owner’s manual for more information. 
 

NeVeR RUN THe PUMP WITHOUT eNOUGH WATeR 

IN THe BATH TO COVeR THe JeTS.

3.  

Inspect the plumbing for leaks.

4.  

Turn the equipment Off and then drain the water

The bath unit and its plumbing are designed to drain 
after each use whether used as a hydrotherapy bath, 
soaking bath, or when taking a shower.

Содержание Designer MicroSilk-AirMasseur

Страница 1: ...ible for ensuring that the unit is free from defects or shipping damage In the event of a problem DO NOT install the unit Jason International is not responsible for damage that might have been avoided by inspection or testing prior to installation If the carton shows sign of damage inspect the product before accepting and describe the problem on the Bill of Lading Damage to the unit during install...

Страница 2: ...blower is required and should be designed to draw in indoor ambient air at a minimum of 72 F 22 C INSTALLATION INSTRUCTIONS 4 Install the drain and overflow assembly to the bath shell according to the instructions provided with the drain and position the bath in the area of intended installation 5 Finish plumbing rough in of drain and overflow assem bly At this time considerations should be made f...

Страница 3: ...lation Operation and Maintenance manual of the separately packaged MicroSilk hydrotherapy bath unit WARNING SYSTEM UNDER PRESSURE NEVER PERFORM MAINTENANCE WHILE SYSTEM IS RUNNING Figure 3 Figure 4 Note Verify the MicroSilk Pump Assembly is the same unit that was provided for the bath being installed The serial number listed on the label provided on the MicroSilk Pump Assembly carton should match ...

Страница 4: ...led following E T L Guidelines During installation if remote mounting of the blower is desired or required the following procedures should be followed NOTE Do not remote mount the blower more than 15 feet 457cm away from the air inlet of the bath Choose a location as close as possible to the bath to assure maximum efficiency 1 The installer must determine the layout of the piping exact remote moun...

Страница 5: ...nstallation is to be done by a Massachusetts licensed plumber 4 Standard Premier Edition MicroSilk AirMasseur Control Box 120v The MicroSilk generator unit may be shipped separate from the bath Follow the instructions for the MicroSilk Pump Assembly Field Installation in the Installation section of this owner s manual instructions are also packaged with the MicroSilk unit packaging The blower is p...

Страница 6: ... and controls must be positioned horizontally and located to permit access for inspection and servicing If the MicroSilk generator unit is shipped separate from the bath the MicroSilk pump s power cord will need to be plugged into the control box Connect the pump s male J J plug to the female J J plug of the control box s load line The MicroSilk and blower junction box must be plugged into a dedic...

Страница 7: ...n to minimize cleanup and prevent surface damage WATER TESTING Before finishing the installation it is recommended that the bath be water tested and the plumbing tested for leaks 1 Before water testing the bath make sure any pump unions are hand tight Do not over tighten or use a pipe wrench This will damage the unions and cause leaking If the unit leaks with the unions hand tight then loosen the ...

Страница 8: ...power cord will need to be plugged into the control box B Refer to the ELECTRICAL section of this manual for connecting the pump to the control box D Two pin terminal for installation of the water sensor to the MicroSilk control box mICROSILK AIRMASSEUR control box connections STANDARD EDITION MicroSilk AIRMASSEUR Figure 9 Jason s Premier Edition MicroSilk AirMasseur system incorporates all the fe...

Страница 9: ... by Jason International Inc and features the ultimate in luxury bathing for the leisure bath industry The MicroSilk and blower control boxes must be properly connected for the bath to function correctly THE AIRMASSEUR CONTROL BOX The blower and ozone sanitation unit must be plugged into the proper receptacles for correct operation of the MicroSilk AirMasseur system See Figure 11 for connections Pr...

Страница 10: ... bath system The air bath system includes a variable speed 1 HP air blower with heater and three 3 massage modes Continuous Wave or Pulse The system also includes a Chromatherapy mood light Automatic Ozone System that will be operated any time the blower is powered a digital control with LCD display window low water and temperature sensors and a 20 minute timer Signature Touchpad A main control to...

Страница 11: ...e Operating The Signature Edition MicroSilk AirMasseur Touchpad section for details on activating this setting Filling and Draining Close the drain and fill the bath with water at least two 2 inches 50mm above the jets The inlet temperature should not exceed 60 C 140 F as this could damage the acrylic surface When bath is in use turn the unit Off before draining the water The bath unit and its plu...

Страница 12: ...er Pressing the icon the first time starts the blower in the constant high speed mode Pressing the icon again begins the wave mode indicated by a slow flashing light Pressing the icon a third time will change the blower to pulse mode This is indicated by a rapid light flash Blower Speeds Icon The Blower Speeds icon is used to increase or decrease the blower speed once the blower is On Press and ho...

Страница 13: ...uring the purge idle period LED Light Icon Hold the key for less than two 2 seconds to turn the lights Off or On Hold the key for more than two 2 seconds to change modes The Light icon should remain lit as long as the bath is connected to a power supply This function has a two hour timer and remembers the last mode The LCD dis plays Light On or Light Off while the key is pressed for less than two ...

Страница 14: ...ensure a quick response on warranty items The serial number can be found on the front page of this manual or on the small card adhered to the back of the bath just above the equipment ALL WARRANTY REPAIRS MUST BE AUTHORIZED BY THE MANUFACTURER BEFORE WORK IS STARTED HUMIDITY Warning Avoid high humidity levels in your home Mold mildew fungi and bacteria which may be harmful to health thrive in area...

Страница 15: ... water a Venturi clogged b Float valve no operating a Refer to installer dealer b Refer to installer dealer Pump operates but water is not being pumped a Suction or discharge blocked b Suction air leak System usually surges a Remove obstruction b Make sure connection is tight on suction side of the pump Pump does not manually shut off a Digital or Touch Control defective a Refer to installer deale...

Страница 16: ... itself or before time elapses a Blower motor overheated and thermal protection device deactivated motor possibly low voltage b GFCI tripped a Check that blower has sufficient ventilation and that the intake into the blower is not blocked Clear and allow mo tor to cool down Check service wire size b Refer to installer dealer Circuit breaker trips repeatedly a Defective breaker b Short circuit betw...

Страница 17: ...istamines vasoconstrictors vasodilators hypnotics narcotics or tranquilizers F Persons with a medical history of heart disease low or high blood pressure circulatory system problems or diabetes should consult a physician before using a hydrotherapy bath G Persons using medication should consult a physician before using a hydrotherapy bath since some medication may induce drowsiness while other med...