Jason International, Inc. •
501.771.4477
Page 7 of 17
Customer Service : 800.255.5766
Copyright © 2013 Jason International.
INSTALLATION INSTRUCTIONS (cont.)
CLeANING
1.
Remove all loose debris
. Construction plaster or
excess grout can be removed with the use of a wood
(edge) trowel.
2.
Paint or tar stains
may need to be removed with a
cleaner, such as paint thinner, turpentine, or isopropyl
alcohol (rubbing alcohol). Never allow the cleaner to
soak against the acrylic surface for long periods of time.
Always rinse the surface immediately following the
use of cleaners.
3. Follow the manufacturer’s instructions for safe use of
cleaning products. If the surface becomes scratched
or dulled, it may be restored by using a quality plastic
polish, like Novus Plastic Polish No. 2 (available from
the Jason Dealer).
It is always preferable to protect
the acrylic surface during installation to minimize
cleanup and prevent surface damage.
WATeR TeSTING
Before finishing the installation, it is recommended that the
bath be water tested and the plumbing tested for leaks.
1.
Before water testing the bath
, make sure any pump
unions are hand tight. Do not over tighten or use a pipe
wrench. This will damage the unions and cause leaking.
If the unit leaks with the unions hand tight, then loosen
the union(s) and check the O-ring seal to ensure it is
properly seated.
2.
Fill and operate the bath
. Close the drain and fill the
bath with water to at least 10 inches [25 cm] below the
bath deck. The inlet temperature should not exceed
140°F (60°C) as this could damage the acrylic surface.
Refer to the
FILLING AND DRAINING
section of this
owner’s manual for more information.
NeVeR RUN THe PUMP WITHOUT eNOUGH WATeR
IN THe BATH TO COVeR THe JeTS.
3.
Inspect the plumbing for leaks.
4.
Turn the equipment Off and then drain the water
.
The bath unit and its plumbing are designed to drain
after each use whether used as a hydrotherapy bath,
soaking bath, or when taking a shower.