14
4. MAINTENANCE
4.2 Periodic check
WARNING
Periodic check should be carried out by qualified professionals to ensure safety.
Thepower of the switching box and the welding machine should be shut down
before periodic check to avoid personal injury accidents such as electric shock
and burns. Due to the discharge of capacitors, checking should be carried out
5 minutes after the machine is powered off.
Tips:
Содержание Arc 140
Страница 2: ......
Страница 6: ...TABLE OF CONTENTS ...