7.1.7.
Outline Drawing of the Operation Unit NCE-7699A ........................................................ 7-8
7.1.8.
Outline Drawing of the Multi-function Operation Unit NCE-7729A .................................. 7-9
7.1.9.
Outline Drawing of the Rectifier NBA-5111 (Option)...................................................... 7-10
7.2.
System Diagrams..................................................................................................................7-11
7.2.1.
Overall System Diagram of the Radar JMA-5222-7/9 ....................................................7-11
7.2.2.
Overall System Diagram of the Radar JMA-5212-4/6/4HS/6HS ................................... 7-12
7.3.
Inter-Unit Connection Diagram............................................................................................. 7-13
7.3.1.
Inter-Unit Connection Diagram of the
JMA-5222-7/9 .................................................... 7-13
7.3.2.
Inter-Unit Connection Diagram of the JMA-5212-4/6/4HS/6HS .................................... 7-14
7.4.
Unit Internal Connection Diagrams ...................................................................................... 7-15
7.4.1.
Internal Connection Diagram of the Scanner Unit NKE-2254 ....................................... 7-15
7.4.2.
Internal Connection Diagram of the Scanner Unit NKE-2103 ....................................... 7-16
7.4.3.
Internal Connection Diagram of the Processor Unit NDC-1460 .................................... 7-17
Содержание JMA-5212-4
Страница 2: ......
Страница 7: ...Chapter 1 Equipment Overview...
Страница 8: ......
Страница 11: ...Chapter 2 Equipment Overview...
Страница 12: ......