Do not open the pump lid before pressure testing,
because the blue pressure test o-ring may fall out. If
this happens, you will need to replace it.
CAUTION
If you have not opened the pump lid, skip to
Section
3.3.2, Conduct Pressure Test.
3.3.1 Replace Blue Pressure Test O-ring if
Necessary
If you open the pump lid
before
conducting the
pressure test, the blue o-ring will probably fall out. If
this happens, you will need to install it on the lid again
before conducting pressure testing.
There is a risk of damage to the blue o-ring during re-
installation. If you damage it when trying to re-install
it, you will need to order a new blue pressure test o-ring
(R0479000) before you begin conducting the pressure
test.
These instructions describe the proper procedures for
replacing, using, and disposing of the blue o-ring.
These instructions must be followed exactly. Read
through the instructions completely before starting
the procedure.
3.3.1.1
Remove Pump Lid
1.
Make sure that the pump is turned off.
2.
Make sure that the switch to the circuit breaker
that powers the pump motor is turned off.
Turn off the pump and the main breaker in the
pump electrical circuit before starting the procedure.
Failure to comply may cause a shock hazard,
resulting in severe personal injury or death.
WARNING
Due to the potential risk of fire, electric shock, or
injuries to persons, Jandy Pro Series Pumps must
be installed in accordance with the National Electri-
cal Code
®
(NEC
®
), in the USA, or the Canadian
Electrical Code (CEC
®
) in Canada. All applicable
local codes must also be followed.
The NEC may be obtained by contacting the
National Fire Protection Association
®
(NFPA
®
) at
1-800-344-3555 or 1-617-770-3000.
WARNING
3.
Insulate all connections carefully to prevent
grounding or short-circuits. Sharp edges on
terminals require extra protection. To prevent
wire nuts from loosening, tape them using
a suitable, listed (UL, ETL, CSA) electrical
insulating tape. For safety, and to prevent entry
of contaminants, reinstall all conduit and terminal
box covers.
Do not force connections into the
conduit box.
4.
To configure the internal wiring of the pump
motor for the correct voltage, refer to the
diagram on the motor data plate.
3.3 Pressure Testing
All model SHP pumps come with an additional
disposable o-ring for pressure testing. This is the
blue pressure test o-ring. See Figures 3 and 4.
Lid with
Locking
Ring
and
Seal
Blue
Pressure
Test
O-ring
Pump
Debris
Trap
Basket
(Inside
Pump)
Figure 3. Exploded View of Pump
Lid with
Locking
Ring
Blue Pressure Test
O-ring
Seal
Figure 4. Blue Pressure Test O-ring in Lid
Assembly
Page 10
ENGLISH
Jandy
®
Pro Series Stealth
™
Pumps
|
Operation Manual