31
P
E
F
G
H
J
B
D
A
C
K
L
M
N
Con
ve
yor
Up/Do
wn
Swing
Fr
on
t Do
or
Rear Do
or
Co
nv
ey
or
Connector
•
Use a good set of Allen wrenches when changing orifices.
•
The cartridge should be tightened with 25 ft-lbs of torque.
•
The coil nut should be tightened with 5 ft-lbs of torque.
•
There is a spring, poppet valve, and ball bearing at the bottom of each coil.
•
The top coil operates the bottom port.
•
The bottom coil operates the top port.
•
When changing cartridge make sure all functions are at rest.
•
The lettering on the coils should always be facing up.
Valve Wiring
Letter Function
A
N/A
B
N/A
C
Conveyor Swing Front
D
Conveyor Swing Rear
E
Conveyor Up
F
Conveyor Down
G
Rear Door Up
H
Front Door Down
J
Power
K
Front Door Up
L
Rear Door Down
M
N/A
N
Conveyor Start
P
Ground
Letter Function
A
N/A
B
N/A
C
Conveyor Swing Front
D
Conveyor Swing Rear
E
Conveyor Up
F
Conveyor Down
G
Rear Door Up
H
Front Door Down
J
Power
K
Front Door Up
L
Rear Door Down
M
N/A
N
Conveyor Start
P
Ground
Содержание SpeedTender LC290
Страница 2: ......
Страница 42: ...42 Chassis 13 12 10 11 1 18 17 16 15 14 18 17 27 25 18 26 24 17 23 16 22 18 17 19 20 21 4 2 3 1 9 8 4 5 6 7 ...
Страница 50: ...50 Shell 13 12 11 14 7 15 9 10 6 16 4 3 5 6 8 7 6 2 1 20 25 17 27 23 24 26 6 21 22 7 18 19 12V Battery used ...
Страница 62: ...62 Roll Tarp 3 5 2 4 1 7 6 8 9 19 18 4 19 21 22 20 19 27 26 16 25 24 23 13 7 17 16 10 14 12 15 11 1 13 ...