Operation Instruction
Warning !
DO NOT RUN DRY
1. Turn to open drain plug. 3 to 5 second for air to release from the pipe
2. Press On/Off switch to activate timer.
3. At any time, water drain completely from the basin. Press
On/Off switch to stop or built in two minute timer.
On/Off
Switch
Fastner
1-3/8” Hole
for On/Off Switch
Figure 1
1. Make a hole ( size 1-3/8”) for the On/Off switch as shown (see fig 1). Pre-
drill required.
2. Placed a 1/8” clear hose into the rear of the switch and on/off switch into the
hole.
3. The discharge pump kit is made to fit onto the pedicure unit. (see fig 2)
4. Connect E-Z connector onto the drain elbow.
5. Plug discharge pump outlet into the two minute timer outlet
6. Plug two minute timer into the wall outlet.
7. It is very important that tip of the clear tub remain above the water Level with
one loop as shown.
** Please cut to fit 1” Flex hose to your size**
Discharge Pump
Installation Instruction
On/Off
Switch
Fastner
EPISODE
LX
FULL TIME
P
A
R
T
T
IM
E
P
A
R
T
T
IM
E
2 Min.Timer
(D.pump)
L
ig
h
t
T
ra
n
sf
o
rm
e
r
Pipeless Motor
Power Plug
Power Plug
to wall outlet
3/8” clear Tube
from On/Off Switch
for Part time control box
3/8” Clear Tube from on/off for D/P pump
insert into 2 Min. Timer.
Make sure to push in tightly.
Electrical Control Box
(Located left bottom
inside of base)
½”X ½” Brass
Check Valve
PLUMBER MUST BE UTILIZED TO INSTALL
CHECK VALVE and Utility Valves for Hot / Cold Water
DRAIN OUTLET MUST BE ½”
or 3/4” FOR EFFICIENT DRAINAGE.
1” PCV Pipe
1 1/4” x 1 1/4” connector
Max. Drainage height : 4ft.
½” Discharge Outlet.
Содержание EPISODE LX
Страница 21: ......