INSTALLATION
The Jamec Pem PRO:X Hose Reel can be
mounted in a vertical position.
1. Chose a location that is near to the water
source or compressed air source.
2. For large areas, place the hose reel at the
centre of the work area.
3. When mounting the hose reel, ensure
there is adequate clearance under the
reel to prevent injury or damage.
4. Mounting bracket must be installed on
a flat surface.
Note: It is recommended to install the
mounting bracket 0.8 metre (minimum) above
the floor level.
5. The wall bracket
supplied has 4 x M8
holes. The masonry
anchors supplied
are M12 OD with M8
threads to fit into the
wall bracket. If attaching
to masonry, drill 4 x
M12 holes to affix the
masonry anchors,
making sure to locate
the holes in the right
position to match the
wall bracket.
(Fig. 1)
6. Connect the hose reel
to the Mounting Bracket
with the Pivot Pin.
(Fig. 2)
7. Connect the inlet
leader hose to the
source using the
fittings supplied.
Note: Apply thread sealing
tape to all air line and air
hose fittings.
OPERATION
1. Slowly pull out the hose to the required
length. A ‘click’ noise will be heard. To lock
the reel, allow the hose to retract slowly after
hearing ‘click’.
2. To release the hose, pull out the hose until
you hear a ‘click’, and then allow the hose
to slowly retract while guiding the hose
back into the hose reel. The self layering
mechanism will coil the hose back onto the
inner drum.
3. To avoid injury and damage, always hold the
hose while it is retracting. This hose reel has
a controlled return function which allows the
hose to return slowly if it is let go. It is always
recommended to always hold the hose while
it’s retracting. In the event the hose is let go
this controlled return function will stop the
hose from reacting too fast.
0.8 metre min.
Fig. 1
Mounting Bracket
Fig. 2
Pivot Pin